ABT METER DATA

01

Function of ABT Meter

02

Quantity of Meter Installed to each constituent of State

03

Details associated with ABT  Meter.

04

Pictorial View of Meter Locations

As per GERC order date 11th Augsut-2006, Weekly UI calculations &    Reactive  Energy Account under Intra State ABT is to be done by State Load Dispatch Centre by measuring the energy exchanges at identified Locations. The ABT meter is installed at such identified locations for the purpose of measuring energy exchanges. The details associated with this location are put up on website for information to each concerned entity. These details shall not be used for the commercial purpose nor should be quoted anywhere. The SLDC does not take any responsibility for the damage or loss occurred due to above information.                    

01

  Function of ABT Meter

The ABT Energy Meters are specifically designed Three Phase, Four Wire static meters having accuracy class of 0.2S. Function of ABT meters is to measure the net energy transmitted in Wh in each 15-minute time block of real time along with the average frequency. This meters are designed to record reactive energy in VARh under the predefined high /low voltage condition.               

02

  Quantity of Meter Installed in State

Sr No NAME OF ENTITIES NOS OF  ABT METER INSTALLED L & T MAKE SEMS MAKE
1   GSECL 240 94 146
2   UGVCL 66 0 6
3   MGVCL 72 3 69
4   DGVCL 55 1 54
5   PGVCL 76 62 14
6   CPP 15 4 11
7   IPP 68 8 60
8   WF 21 21 0
9   SECO 18 0 18
10   AECO 5 0 5
11   KPT 2 2  
    TOTAL 638 195 443

 

                     

03

  Details associated with ABT Meter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UGVCL

MGVCL

PGVCL

DGVCL

 

 

 

 

 

 

 

GSECL

CAPTIVE PLANT

IPP

TPAECO

 

 

 

 

 

 

 

WIND FARM

TPSECO

 

 

TOP

(1) METER INSTALLED IN UTTAR GUJRAT VIJ COMPANY LTD.
Sr. No. Name of Sub Station / Power station Location Description Location ID Meter Number CTR PTR Location ID
1 Ambaliyara 66 KV  Nirmali line-1 at Ambaliyara(M) ABLNMLM1 GJ-0372-A 300/1 66000/110 UG-01
2 Chhatral 220 KV  GTPS line-1 at Chhatral(S) CHHGTPS1 GJ-0353-A 600/1 220000/110 UG-02
3 Chhatral 220 KV  GTPS line-2 at Chhatral(S) CHHGTPS2 GJ-0354-A 600/1 220000/110 UG-03
4 Deodar 220 KV  Anjar  line-1 at Deodar(M) DEOANJM1 GJ-0345-A 600/1 220000/110 UG-04
5 Dhandhuka 132 KV  Barvala line-1 at Dhandhuka DHABRVM1 GJ-0159-A 300/1 132000/110 UG-05
6 Dhandhuka 132 KV  Dhuvaran GPS line-1 at Dhandhuka DHADTPS1 GJ-0258-A 600/1 132000/110 UG-06
7 Dhandhuka 132 KV  Dhuvaran GPS line-2 at Dhandhuka DHADTPS2 GJ-0163-A 600/1 132000/110 UG-07
8 Dhandhuka 132 KV  Paliyad line-1 at Dhandhuka DHAPLDM1 GJ-0162-A 600/1 132000/110 UG-08
9 Dhandhuka 132 KV  Vikram line-1 at Dhandhuka DHAVKMM1 GJ-0257-A 600/1 132000/110 UG-09
10 Dhansura 220 KV  KHPS line-1 at Dhansura(S) DHNKHPS1 GJ-0010-B 600/5 220000/110 UG-10
11 Dhansura 220 KV  KHPS line-2 at Dhansura(S) DHNKHPS2 GJ-0408-A 600/1 220000/110 UG-11
12 Dhansura 220 KV  WTPS line-1 at Dhansura(S) DHNWTPS1 GJ-0370-A 600/1 220000/110 UG-12
13 Dhansura 220 KV  WTPS line-2 at Dhansura(S) DHNWTPS2 GJ-0364-A 600/1 220000/110 UG-13
14 Dholka GIDC 66 KV  Kheda line-1 at Dholka GIDC (SAMADRA)-DholkaGIDC(M) DLKKDAM1 GJ-0306-A 300/1 66000/110 UG-14
15 Jamla 220 KV  GTPS line-1 at Jamla(S) JMLGTPS1 GJ-0406-A 600/1 220000/110 UG-15
16 Jamla 220 KV  GTPS line-2 at Jamla(S) JMLGTPS2 GJ-0404-A 600/1 220000/110 UG-16
17 Kanbha(Barejadi) 66 KV Mehmedabad  line-2 at Barejadi(Kanbha)(M) KNBMHEM2 GJ-0295-A 300/1