Power Supply and Generation Data for 2-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3572 |
2361 |
2542 |
8475 |
23.00 |
|
Min. Demand catered in MW |
3474 |
2488 |
1879 |
7841 |
18.30 |
|
Energy Catered in Mus. |
83.108 |
58.011 |
55.281 |
196.400 |
|
|
Schedule Share |
Central Sector + Bilateral |
46.883 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.28 |
48.81 |
49.43 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.736 |
11.004 |
18.500 |
11.672 |
49.912 |
|
UGVCL |
4.546 |
3.287 |
23.505 |
8.976 |
40.314 |
|
MGVCL |
2.848 |
5.638 |
3.463 |
7.308 |
19.257 |
|
DGVCL |
4.096 |
5.393 |
2.262 |
15.942 |
26.693 |
|
TOTAL |
20.226 |
25.322 |
47.730 |
43.898 |
137.176 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
83.108Mus |
|
B |
DAILY PLF |
79.79% |
|
C |
DAILY PAF |
85.08% |
|
D |
CUMMULATIVE PLF |
75.49% |
|
E |
CUMMULATIVE PAF |
81.72% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
76.86% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.23% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
78.34% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
15 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1951 |
15 |
9444 |
|
Planned Outage |
200 |
0 |
78 |
|
|
|
|
Force Outage |
330 |
120 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
174 |
271 |
444 |
|
|
|
|
Gen. / Flow 7hrs. |
3515 |
81 |
2155 |
2684 |
15 |
8435 |