Power Supply and Generation Data for 7-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3633 |
2201 |
2311 |
8145 |
23.00 |
|
Min. Demand catered in MW |
3227 |
1893 |
2233 |
7353 |
5.00 |
|
Energy Catered in Mus. |
83.356 |
48.509 |
54.338 |
186.203 |
|
|
Schedule Share |
Central Sector + Bilateral |
40.645 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.14 |
48.80 |
49.56 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.176 |
11.112 |
17.346 |
11.357 |
48.991 |
|
UGVCL |
4.277 |
3.112 |
17.987 |
8.038 |
33.414 |
|
MGVCL |
2.756 |
5.717 |
3.061 |
7.991 |
19.525 |
|
DGVCL |
4.244 |
5.284 |
2.195 |
15.619 |
27.342 |
|
TOTAL |
20.453 |
25.225 |
40.589 |
43.005 |
129.272 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
80.572Mus |
|
B |
DAILY PLF |
79.57% |
|
C |
DAILY PAF |
86.01% |
|
D |
CUMMULATIVE PLF |
74.21% |
|
E |
CUMMULATIVE PAF |
81.72% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
|
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.57% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.74% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
14 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1853 |
14 |
9346 |
|
Planned Outage |
270 |
0 |
78 |
|
|
|
|
Force Outage |
330 |
180 |
50 |
|
|
|
|
Available |
152 |
0 |
218 |
|
|
|
|
Restricted Outage |
188 |
289 |
305 |
|
|
|
|
Gen. / Flow 7hrs. |
3279 |
78 |
2075 |
2392 |
14 |
7824 |