Power Supply and Generation Data for 13-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3500 |
2706 |
2263 |
8469 |
15.00 |
|
Min. Demand catered in MW |
3422 |
2311 |
1808 |
7541 |
19.00 |
|
Energy Catered in Mus. |
84.699 |
59.908 |
50.157 |
194.764 |
|
|
Schedule Share |
Central Sector + Bilateral |
47.013 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.675 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.45 |
48.83 |
49.47 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.356 |
11.514 |
18.152 |
12.768 |
51.790 |
|
UGVCL |
4.719 |
3.382 |
23.873 |
9.206 |
41.180 |
|
MGVCL |
3.293 |
5.824 |
3.277 |
7.497 |
19.891 |
|
DGVCL |
4.846 |
5.448 |
1.995 |
16.102 |
28.391 |
|
TOTAL |
22.214 |
26.168 |
47.297 |
45.573 |
141.252 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
81.340Mus |
|
B |
DAILY PLF |
80.33% |
|
C |
DAILY PAF |
85.17% |
|
D |
CUMMULATIVE PLF |
77.07% |
|
E |
CUMMULATIVE PAF |
81.74% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
85.73% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.77% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
77.96% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1901 |
16 |
9394 |
|
Planned Outage |
270 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
180 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
212 |
287 |
80 |
|
|
|
|
Gen. / Flow 7hrs. |
3617 |
80 |
2597 |
2378 |
16 |
8672 |