Power Supply and Generation Data for 18-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3706 |
2563 |
2563 |
8832 |
15.00 |
|
Min. Demand catered in MW |
3668 |
2311 |
2090 |
8069 |
9.00 |
|
Energy Catered in MUs |
88.270 |
59.399 |
53.376 |
201.045 |
|
|
Schedule Share |
Central Sector + Bilateral |
50.678 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
49.55 |
48.62 |
49.00 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.137 |
11.990 |
18.626 |
12.553 |
52.306 |
|
UGVCL |
4.765 |
3.412 |
23.808 |
8.927 |
40.912 |
|
MGVCL |
3.107 |
5.96 |
3.317 |
8.063 |
20.447 |
|
DGVCL |
4.763 |
5.489 |
2.093 |
16.225 |
28.570 |
|
TOTAL |
21.772 |
26.851 |
47.844 |
45.768 |
142.235 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
85.752 MUs |
|
B |
DAILY PLF |
84.69 % |
|
C |
DAILY PAF |
86.69 % |
|
D |
CUMMULATIVE PLF |
78.96 % |
|
E |
CUMMULATIVE PAF |
81.77 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
81.13 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.66 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
78.96 % |
6. Generation available in MW at 07.00 Hours
GUJARAT |
PLF Thermal |
Hydro |
PVT+(CPP+215 ) |
CEN. SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Tot Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2204 |
16 |
9697 |
|
Planned Outage |
270 |
0 |
0 |
|
|
|
|
Force Outage |
360 |
235 |
125 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Rest Outage |
85 |
231 |
84 |
|
|
|
|
Gen/Flow at 7hrs. |
3504 |
81 |
2518 |
2406 |
16 |
8666 |