Power Supply and Generation Data for 20-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3512 |
2390 |
2650 |
8552 |
15.00 |
|
Min. Demand catered in MW |
3369 |
2222 |
2117 |
7708 |
19.00 |
|
Energy Catered in Mus. |
84.038 |
56.342 |
53.844 |
194.224 |
|
|
Schedule Share |
Central Sector + Bilateral |
45.254 |
|||
|
|
|
|
|||
2. BILATERAL TRANSCATION DATA IN Mus :
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.30 |
48.61 |
49.15 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.155 |
11.181 |
17.648 |
12.335 |
50.319 |
|
UGVCL |
4.694 |
3.174 |
22.787 |
8.840 |
39.495 |
|
MGVCL |
3.333 |
6.013 |
3.212 |
7.979 |
20.537 |
|
DGVCL |
4.849 |
5.247 |
1.883 |
15.508 |
27.487 |
|
TOTAL |
22.031 |
25.615 |
45.530 |
44.662 |
137.838 |
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
82.170MUs |
|
B |
DAILY PLF |
81.15 % |
|
C |
DAILY PAF |
82.54 % |
|
D |
CUMMULATIVE PLF |
79.14 % |
|
E |
CUMMULATIVE PAF |
81.77 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
86.58 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.27 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.76 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Planned Outage |
4219 |
547 |
2727 |
2072 |
16 |
9565 |
|
Force Outage |
200 |
0 |
0 |
|
|
|
|
Available |
120 |
315 |
250 |
|
|
|
|
Restricted Outage |
0 |
0 |
0 |
|
|
|
|
Gen. / Flow 7hrs. |
246 |
151 |
65 |
|
|
|
|
|
3653 |
81 |
2412 |
2169 |
16 |
8315 |