Power Supply and Generation Data for 28-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3426 |
2469 |
2542 |
8437 |
9.00 |
|
Min. Demand catered in MW |
3116 |
2771 |
1848 |
7735 |
18.30 |
|
Energy Catered in Mus. |
79.342 |
60.653 |
51.981 |
191.976 |
|
|
Schedule Share |
Central Sector + Bilateral |
45.836 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.570 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.70 |
48.40 |
48.95 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.348 |
11.414 |
16.201 |
11.858 |
48.821 |
|
UGVCL |
4.924 |
3.345 |
20.386 |
7.815 |
36.470 |
|
MGVCL |
3.36 |
5.81 |
2.633 |
8.04 |
19.843 |
|
DGVCL |
4.697 |
5.2 |
1.731 |
15.372 |
27.000 |
|
TOTAL |
22.329 |
25.769 |
40.951 |
43.085 |
132.134 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
77.673Mus |
|
B |
DAILY PLF |
76.71% |
|
C |
DAILY PAF |
84.68% |
|
D |
CUMMULATIVE PLF |
79.55% |
|
E |
CUMMULATIVE PAF |
81.73% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
75.37% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
76.71% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.99% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
65 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2144 |
65 |
9637 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
440 |
135 |
0 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
304 |
332 |
250 |
|
|
|
|
Gen. / Flow 7hrs. |
3275 |
80 |
2477 |
2017 |
65 |
7849 |