Power Supply and Generation Data for 02-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3649 |
2438 |
2237 |
8321 |
23.00 |
|
Min. Demand catered in MW |
3135 |
2346 |
1879 |
7360 |
5.00 |
|
Energy Catered in Mus. |
81.419 |
57.360 |
49.578 |
188.357 |
|
|
Schedule Share |
Central Sector + Bilateral |
50.769 |
|||
|
Bilateral Sale |
0.800 |
|
Bilateral Purchase |
0.000 |
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.88 |
48.78 |
49.20 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
7.974 |
9.697 |
20.914 |
12.586 |
51.171 |
|
UGVCL |
3.763 |
2.691 |
24.226 |
8.629 |
39.309 |
|
MGVCL |
2.439 |
5.366 |
3.438 |
7.084 |
18.327 |
|
DGVCL |
3.873 |
4.939 |
2.2 |
14.598 |
25.610 |
|
TOTAL |
18.049 |
22.693 |
50.778 |
42.897 |
134.417 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
79.284 Mus |
|
B |
DAILY PLF |
78.30 % |
|
C |
DAILY PAF |
84.08 % |
|
D |
CUMMULATIVE PLF |
74.88 % |
|
E |
CUMMULATIVE PAF |
81.60 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
79.99 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
78.38 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.03 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
15 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2065 |
15 |
9558 |
|
Planned Outage |
120 |
0 |
60 |
|
|
|
|
Force Outage |
315 |
60 |
52 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
126 |
481 |
425 |
|
|
|
|
Gen. / Flow 7hrs. |
3658 |
6 |
2250 |
1820 |
15 |
7734 |
.