Power Supply and Generation Data for 03-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3750 |
2500 |
2277 |
8527 |
23.00 |
|
Min. Demand catered in MW |
3631 |
2312 |
1461 |
7404 |
8.00 |
|
Energy Catered in Mus. |
88.768 |
56.997 |
44.746 |
190.511 |
|
|
Schedule Share |
Central Sector + Bilateral |
47.124 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
2.350 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.65 |
48.77 |
49.13 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.154 |
9.564 |
21.317 |
11.239 |
50.274 |
|
UGVCL |
3.572 |
2.661 |
24.709 |
8.081 |
39.023 |
|
MGVCL |
2.511 |
5.496 |
3.506 |
7.258 |
18.771 |
|
DGVCL |
3.676 |
5.036 |
2.078 |
14.886 |
25.676 |
|
TOTAL |
17.913 |
22.757 |
51.610 |
41.464 |
133.744 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.429Mus |
|
B |
DAILY PLF |
85.93% |
|
C |
DAILY PAF |
91.20% |
|
D |
CUMMULATIVE PLF |
74.91% |
|
E |
CUMMULATIVE PAF |
81.60% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
81.61% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
86.14% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.05% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1989 |
16 |
9482 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
320 |
60 |
0 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
180 |
482 |
326 |
|
|
|
|
Gen. / Flow 7hrs. |
3599 |
5 |
2401 |
2142 |
16 |
8147 |