Power Supply and Generation Data for 09-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3957 |
2389 |
2218 |
8564 |
23.00 |
|
Min. Demand catered in MW |
3443 |
2348 |
1823 |
7614 |
5.00 |
|
Energy Catered in Mus. |
88.093 |
56.157 |
48.347 |
192.957 |
|
|
Schedule Share |
Central Sector + Bilateral |
49.557 |
|||
|
|
|
|
|||
|
Bilateral Sale |
1.850 |
|
Bilateral Purchase |
0.000 |
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.19 |
48.62 |
49.21 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.766 |
10.310 |
20.307 |
12.66 |
52.043 |
|
UGVCL |
4.008 |
3.194 |
23.91 |
8.911 |
40.023 |
|
MGVCL |
2.578 |
5.429 |
3.518 |
7.016 |
18.541 |
|
DGVCL |
4.052 |
5.216 |
2.041 |
15.416 |
26.725 |
|
TOTAL |
19.404 |
24.149 |
49.776 |
44.003 |
137.332 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
86.023 MUs |
|
B |
DAILY PLF |
84.95 % |
|
C |
DAILY PAF |
91.58 % |
|
D |
CUMMULATIVE PLF |
75.01 % |
|
E |
CUMMULATIVE PAF |
81.65 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
89.42 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
85.72 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.07 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
-184 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1876 |
-184 |
9369 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
60 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
200 |
481 |
32 |
|
|
|
|
Gen. / Flow 7hrs. |
3779 |
6 |
2645 |
1872 |
-184 |
8302 |
.