Power Supply and Generation Data for 14-March-2008

Home           Past data           Monthly report           Trend           Unit outages 

             

1.        Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW              

3759

2567

2368

8694

23.00

 M Min. Demand catered in MW   

3599

2739

1706

8044

06.00

Energy Catered in Mus

87.786

61.072

50.773

199.631

Schedule Share

Central Sector + Bilateral

45.488

  2.    BILATERAL TRANSACTION DATA IN MUs:

Bilateral  Sale  

4.975

Bilateral Purchase

0.000

 

3.        FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

49.94

48.72

49.10

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.983

11.679

20.122

13.391

54.175

UGVCL

4.034

3.211

23.894

9.283

40.422

MGVCL

2.642

6.982

3.458

5.416

18.498

DGVCL

4.202

5.255

2.062

15.534

27.053

TOTAL

19.861

27.127

49.536

43.624

140.148

                                                                                               

5.        Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

85.919 MUs

B

DAILY PLF

84.85  %

C

DAILY PAF

87.80 %

D

CUMMULATIVE PLF

75.12  %

E

CUMMULATIVE PAF

81.68  %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

       85.55 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

      84.86 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

       80.16 %

 

6.    Generation available in MW at 07.00 Hours

GUJARAT

PLF Thermal

Hydro

PVT+(CPP+215 )

CEN.SEC(GUJ+DD+DNH)

Bileteral

TOTAL GUJARAT

Tot   Total Capacity

4219

547

2727

* 3001

-184

10185

Capacity Available

4219

547

2727

2018

-184

9511

Planned Outage

120

0

0

 

 

 

Force Outage

360

 60

50

 

 

 

Available

0

0

0

 

 

 

Rest Outage

127

481

 212

 

 

 

Gen/Flow at 7hrs.

3612

 6

2605

2325

-184

8548