Power Supply and Generation Data for 20-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3850 |
2338 |
2474 |
8662 |
23.00 |
|
Min. Demand catered in MW |
3727 |
1994 |
2209 |
7930 |
8.00 |
|
Energy Catered in Mus. |
89.207 |
52.994 |
57.359 |
199.560 |
|
|
Schedule Share |
Central Sector + Bilateral |
52.655 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.600 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.74 |
48.78 |
49.10 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.98 |
11.491 |
19.703 |
12.539 |
52.713 |
|
UGVCL |
4.356 |
3.112 |
25.574 |
7.921 |
40.963 |
|
MGVCL |
2.708 |
5.312 |
3.332 |
6.789 |
18.141 |
|
DGVCL |
4.171 |
5.513 |
2.237 |
16.293 |
28.214 |
|
TOTAL |
20.215 |
25.428 |
50.846 |
43.542 |
140.031 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
85.248Mus |
|
B |
DAILY PLF |
84.19% |
|
C |
DAILY PAF |
91.23% |
|
D |
CUMMULATIVE PLF |
76.05% |
|
E |
CUMMULATIVE PAF |
81.72% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
84.75% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.19% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.18% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
15 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2274 |
15 |
9765 |
|
Planned Outage |
90 |
0 |
240 |
|
|
|
|
Force Outage |
360 |
60 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
190 |
409 |
162 |
|
|
|
|
Gen. / Flow 7hrs. |
3579 |
78 |
2275 |
2088 |
15 |
8020 |