Power Supply and Generation Data for 23-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3093 |
2103 |
2841 |
8037 |
15.00 |
|
Min. Demand catered in MW |
2767 |
1527 |
2038 |
6332 |
2.00 |
|
Energy Catered in Mus. |
75.866 |
45.261 |
55.346 |
176.473 |
|
|
Schedule Share |
Central Sector + Bilateral |
48.044 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.56 |
49.14 |
49.83 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.084 |
10.463 |
18.969 |
10.535 |
49.051 |
|
UGVCL |
4.069 |
2.859 |
24.237 |
7.72 |
38.885 |
|
MGVCL |
2.791 |
5.674 |
3.375 |
6.607 |
18.447 |
|
DGVCL |
4.474 |
3.961 |
2.053 |
11.709 |
22.197 |
|
TOTAL |
20.418 |
22.957 |
48.634 |
36.571 |
128.580 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
73.574Mus |
|
B |
DAILY PLF |
72.66% |
|
C |
DAILY PAF |
87.38% |
|
D |
CUMMULATIVE PLF |
76.06% |
|
E |
CUMMULATIVE PAF |
81.74% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
84.70% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
77.12% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.19% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2198 |
16 |
9691 |
|
Planned Outage |
0 |
0 |
162 |
|
|
|
|
Force Outage |
405 |
120 |
225 |
|
|
|
|
Available |
45 |
0 |
218 |
|
|
|
|
Restricted Outage |
191 |
345 |
206 |
|
|
|
|
Gen. / Flow 7hrs. |
3578 |
81 |
2328 |
2201 |
16 |
8188 |