Power Supply and Generation Data for 02-May-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3638 |
3042 |
2179 |
8859 |
15.00 |
|
Min. Demand catered in MW |
3643 |
2730 |
1649 |
8022 |
18.30 |
|
Energy Catered in Mus |
86.958 |
68.555 |
47.019 |
202.532 |
|
|
Schedule Share |
Central Sector + Bilateral |
48.568 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
1.268 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
49.78 |
48.72 |
49.21 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.868 |
12.250 |
17.715 |
13.188 |
52.021 |
|
UGVCL |
4.793 |
3.489 |
26.381 |
8.640 |
43.303 |
|
MGVCL |
3.148 |
5.849 |
3.366 |
7.612 |
19.975 |
|
DGVCL |
4.591 |
5.256 |
2.161 |
15.536 |
27.544 |
|
TOTAL |
21.400 |
26.844 |
49.623 |
44.976 |
142.843 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
83.738 Mus |
|
B |
DAILY PLF |
82.70 % |
|
C |
DAILY PAF |
88.25 % |
|
D |
CUMMULATIVE PLF |
79.68 % |
|
E |
CUMMULATIVE PAF |
81.74 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
83.55 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.14 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
80.09 % |
6. Generation available in MW at 07.00 Hours
GUJARAT |
PLF Thermal |
Hydro |
PVT+(CPP+215 ) |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Tot Total Capacity |
4219 |
547 |
2727 |
* 3001 |
15 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1947 |
15 |
9440 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
240 |
60 |
0 |
|
|
|
|
Available |
45 |
405 |
0 |
|
|
|
|
Rest Outage |
209 |
-1 |
215 |
|
|
|
|
Gen/Flow at 7hrs. |
3525 |
83 |
2889 |
2015 |
15 |
8512 |