Power Supply and Generation Data for 05-May-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3599 |
2548 |
2388 |
8535 |
7.00 |
|
Min. Demand catered in MW |
3463 |
2783 |
1643 |
7889 |
18.30 |
|
Energy Catered in Mus. |
86.724 |
64.051 |
48.380 |
199.155 |
|
|
Schedule Share |
Central Sector + Bilateral |
45.790 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
3.073 |
|
Bilateral Purchase |
1.310 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.43 |
48.87 |
49.69 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.813 |
11.304 |
17.593 |
11.355 |
49.065 |
|
UGVCL |
4.739 |
3.092 |
26.014 |
7.627 |
41.472 |
|
MGVCL |
3.064 |
5.809 |
3.318 |
7.648 |
19.839 |
|
DGVCL |
4.496 |
4.992 |
2.099 |
14.758 |
26.345 |
|
TOTAL |
21.112 |
25.197 |
49.024 |
41.388 |
136.721 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
83.778Mus |
|
B |
DAILY PLF |
82.74% |
|
C |
DAILY PAF |
88.73% |
|
D |
CUMMULATIVE PLF |
79.91% |
|
E |
CUMMULATIVE PAF |
81.76% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
83.29% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
82.74% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.50% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
-184 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2058 |
-184 |
9551 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
60 |
125 |
|
|
|
|
Available |
152 |
0 |
0 |
|
|
|
|
Restricted Outage |
233 |
405 |
-60 |
|
|
|
|
Gen. / Flow 7hrs. |
3514 |
82 |
2662 |
2428 |
-184 |
8686 |