Power Supply and Generation Data for 06-May-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3725 |
3045 |
2137 |
8907 |
15.00 |
|
Min. Demand catered in MW |
3469 |
2927 |
1757 |
8153 |
19.00 |
|
Energy Catered in Mus |
85.574 |
65.955 |
51.464 |
202.993 |
|
|
Schedule Share |
Central Sector + Bilateral |
46.009 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
3.073 |
|
Bilateral Purchase |
1.310 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.46 |
48.81 |
49.63 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
| PGVCL |
9.139 |
12.216 |
18.102 |
12.524 |
51.981 |
| UGVCL |
4.818 |
3.347 |
26.479 |
8.737 |
43.381 |
| MGVCL |
3.052 |
5.83 |
3.421 |
7.608 |
19.911 |
| DGVCL |
4.260 |
5.048 |
2.076 |
14.923 |
26.307 |
| TOTAL |
21.269 |
26.441 |
50.078 |
43.792 |
141.580 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
82.462 Mus |
|
B |
DAILY PLF |
81.44 % |
|
C |
DAILY PAF |
89.14 % |
|
D |
CUMMULATIVE PLF |
79.96 % |
|
E |
CUMMULATIVE PAF |
81.76 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
83.12 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.46% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
80.36% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
-84 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2147 |
-84 |
9640 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
60 |
125 |
|
|
|
|
Available |
152 |
0 |
0 |
|
|
|
|
Rest Outage |
240 |
403 |
441 |
|
|
|
|
Gen/Flow at 7hrs. |
3507 |
84 |
2161 |
2255 |
-84 |
8007 |