Power Supply and Generation Data for 07-May-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3722 |
2663 |
2424 |
8809 |
15.00 |
|
Min. Demand catered in MW |
3613 |
2756 |
1746 |
8115 |
18.30 |
|
Energy Catered in Mus |
86.808 |
63.749 |
51.707 |
202.264 |
|
|
Schedule Share |
Central Sector + Bilateral |
49.080 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
3.330 |
|
Bilateral Purchase |
1.088 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.00 |
48.66 |
49.24 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
| PGVCL |
9.058 |
11.901 |
17.442 |
11.973 |
50.374 |
| UGVCL |
4.675 |
3.587 |
26.099 |
9.343 |
43.704 |
| MGVCL |
3.095 |
5.824 |
3.337 |
7.633 |
19.889 |
| DGVCL |
4.586 |
5.155 |
2.035 |
15.236 |
27.012 |
| TOTAL |
21.414 |
26.467 |
48.913 |
44.185 |
140.979 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.197 Mus |
|
B |
DAILY PLF |
83.15 % |
|
C |
DAILY PAF |
89.75 % |
|
D |
CUMMULATIVE PLF |
80.04 % |
|
E |
CUMMULATIVE PAF |
81.77 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
86.99 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.18% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
80.44% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
76 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2299 |
76 |
9792 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
60 |
250 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Rest Outage |
229 |
333 |
-31 |
|
|
|
|
Gen/Flow at 7hrs. |
3670 |
154 |
2508 |
2066 |
76 |
8398 |