Power Supply and Generation Data for 10-May-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3738 |
2902 |
2396 |
9036 |
15.00 |
|
Min. Demand catered in MW |
3540 |
2674 |
2003 |
82174 |
18.30 |
|
Energy Catered in MUs |
87.777 |
64.351 |
51.666 |
203.794 |
|
|
Schedule Share |
Central Sector + Bilateral |
51.613 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
1.435 |
|
Bilateral Purchase |
1.200 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.04 |
48.83 |
49.40 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.076 |
12.218 |
16.744 |
12.826 |
50.864 |
|
UGVCL |
4.852 |
3.435 |
25.357 |
9.051 |
42.695 |
|
MGVCL |
3.224 |
5.971 |
3.321 |
7.877 |
20.393 |
|
DGVCL |
4.738 |
5.249 |
2.006 |
15.515 |
27.508 |
|
TOTAL |
21.890 |
26.873 |
47.428 |
45.269 |
141.460 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
85.701 MUS |
|
B |
DAILY PLF |
84.64 % |
|
C |
DAILY PAF |
89.58% |
|
D |
CUMMULATIVE PLF |
80.39% |
|
E |
CUMMULATIVE PAF |
81.79 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
85.11 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
85.28 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
80.80 % |
6. Generation available in MW at 07.00 Hours
GUJARAT |
PLF Thermal |
Hydro |
PVT+(CPP+215 ) |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
-134 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2084 |
-134 |
9577 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
60 |
250 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Rest Outage |
308 |
406 |
-51 |
|
|
|
|
Gen/Flow at 7hrs. |
3591 |
81 |
2528 |
2186 |
-134 |
8386 |