Profile Vision & Mission Functions Board of Directors SLDC Officials Evolution of SLDC Contact us
Annual Report Press Release Installed Capacity Technical Minimum Current Merit Order Take/Pay Liabilities(GAS) Power Network
Live Tenders Closed Tenders Vendor Registration
Act & Notifications National Electricity Policy Right to Information Act Presentation Extract of Acts
Constitution of Committee Important Regulations Tariff Petition Commission Orders Petittion Filed & Status
ON Going Power Projects Generating Station EHV Power Line
Meetings Minutes Emloyee Log in e-Urja (ERP) Useful Links

Functions

Functions of State Load Despatch Centres as per IEGC 2003.

(1) The State Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in a State.

(2) The State Load Despatch Centre shall--

(a) be responsible for optimum scheduling and despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;

(b) monitor grid operations;

(c) keep accounts of the quantity of electricity transmitted through the State grid

(d) exercise supervision and control over the intra-State transmission system; and

(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.

(3) The State Load Despatch Centre may levy and collect such fee and charges from the generating companies and licensees engaged in intra-State transmission of electricity as may be specified by the State Commission.

What's New

Celebration of Republicday at SLDC,Gotri .....more


UI ACCOUNT WEEK NO.38 (FROM 19DEC2011 to 25DEC2011) is uploaded.....more


UI ACCOUNT WEEK NO.37 (FROM 12DEC2011 to 18DEC2011) is uploaded.....more


UI ACCOUNT WEEK NO.30 (FROM 24OCT2011 to 30OCT2011 REVISION 1) is uploaded.....more


UI ACCOUNT WEEK NO.32 (FROM 07NOV2011 to 13NOV2011 REVISION 1) is uploaded.....more


UI ACCOUNT WEEK NO.36 (FROM 05DEC2011 to 11DEC2011) is uploaded.....more


UI ACCOUNT WEEK NO.35 (FROM 28NOV2011 to 04DEC2011) is uploaded.....more


UI ACCOUNT WEEK NO.20 (FROM 15AUG2011 to 21AUG2011 revision-1) is uploaded.....more


UI ACCOUNT WEEK NO.19 (FROM 08AUG2011 to 14AUG2011 revision-1) is uploaded.....more


UI ACCOUNT WEEK NO.18 (FROM 01AUG2011 to 07AUG2011 revision-1) is uploaded.....more


GETCO(SLDC) hosting WAMS Meeting at Baroda on 10-12-2011.....more


Member Secretary WRPC at SLDC-GUJARAT on 10-12-2011.....more


Pursuant to the RRF workshops held for the stakeholders of Northern, Southern and Western Regions, the format for information to be collected from Wind/Solar Generators through SLDCs - for implementation of RRF Mechanism is enclosed herewith. It is requested that the same may please be forwarded to the wind/ solar generators for submission of the requisite details. From:-Pushpa.s(Manager(os),WRLDC,Mumbai) & Minaxi Garg(DGM),NLDC...Read More


True-Up for the FY 2010-11 and Aggregate Revenue Requirement for the FY 2012-13 of State Load Dispatch Centre (Case No. 1151 of 2011)....Read More


All Generators are requested to send the Day Ahead Declared Capacity in the Web based scheduling software before 10:00 Hrs.


UI ACCOUNT WEEK NO 30 FROM 24OCT2011 TO 30OCT2011 is uploaded.....more


Wind Energy Certificate for the month Nov-2011 is uploaded.....more


Line/Equipment OUtage Approved for the monthe Feb-2012.....more


MOM For RRF.....more


Mock trial for scheduling of wind and solar generation started from 01-July-2011....more