Profile Vision & Mission Functions Board of Directors SLDC Officials Evolution of SLDC Contact us
Annual Report Press Release Installed Capacity Technical Minimum Current Merit Order Take/Pay Liabilities(GAS) Power Network
Live Tenders Closed Tenders Vendor Registration
Act & Notifications National Electricity Policy Right to Information Act Presentation Extract of Acts
Constitution of Committee Important Regulations Tariff Petition Commission Orders Petittion Filed & Status
ON Going Power Projects Generating Station EHV Power Line
Meetings Minutes Emloyee Log in e-Urja (ERP) Useful Links

Profile

State Load Despatch Centre is the nerve centre for Gujarat Power System operating since 1969. Our principal activities include operating Gujarat system in most economical way by economic load despatching, merit order operation. SLDC, principally has to remain in contact with other utilities like GUVNL (Trading Co.), GSECL (Generating Co.), DISCOMs (DGVCL, MGVCL, UGVCL, PGVCL), AEC, SEC, IPPs, CPPs, Non-Conventional Generating Units and has to be conversant with the matters pertaining to concern utility for best results.

Three Nos. of Area Load Despatch Centre (ALDC) are set up at Gandhinagar, Jambuva and Jetpur under Unified Load Despatch Centre scheme of Western Region.

Supervisory Control and Data Acquisition system referred as SCADA is available at SLDC to get on line data of power system. System analog data such as MW, MVAR, KV and HZ and digital data such as breaker isolator ON or OFF status is available for all power stations, all 400 KV sub-stations and strategic 220 KV sub-stations.

SLDC's structure: For more information about the structure of the SLDC, go to SLDC Structure Our company details

State Load Despatch Centre, GETCO GUJARAT (SLDC Gotri) is a wholly-owned subsidiary of Gujarat Energy Transmission Corporation Limited encompasses virtually Generation Scheduling, monitoring real-time power system network, managing line and unit outages and assets of the GETCO Limited Group.

Registered Office: State Load Despatch Centre, 132kV Gotri Sub Station Compound, Nr. T.B. Hospital, Gotri Road, Vadodara 390021, Gujarat, INDIA

For corporate enquiries email: sldc@gebmail.com

What's New

Celebration of Republicday at SLDC,Gotri .....more


UI ACCOUNT WEEK NO.38 (FROM 19DEC2011 to 25DEC2011) is uploaded.....more


UI ACCOUNT WEEK NO.37 (FROM 12DEC2011 to 18DEC2011) is uploaded.....more


UI ACCOUNT WEEK NO.30 (FROM 24OCT2011 to 30OCT2011 REVISION 1) is uploaded.....more


UI ACCOUNT WEEK NO.32 (FROM 07NOV2011 to 13NOV2011 REVISION 1) is uploaded.....more


UI ACCOUNT WEEK NO.36 (FROM 05DEC2011 to 11DEC2011) is uploaded.....more


UI ACCOUNT WEEK NO.35 (FROM 28NOV2011 to 04DEC2011) is uploaded.....more


UI ACCOUNT WEEK NO.20 (FROM 15AUG2011 to 21AUG2011 revision-1) is uploaded.....more


UI ACCOUNT WEEK NO.19 (FROM 08AUG2011 to 14AUG2011 revision-1) is uploaded.....more


UI ACCOUNT WEEK NO.18 (FROM 01AUG2011 to 07AUG2011 revision-1) is uploaded.....more


GETCO(SLDC) hosting WAMS Meeting at Baroda on 10-12-2011.....more


Member Secretary WRPC at SLDC-GUJARAT on 10-12-2011.....more


Pursuant to the RRF workshops held for the stakeholders of Northern, Southern and Western Regions, the format for information to be collected from Wind/Solar Generators through SLDCs - for implementation of RRF Mechanism is enclosed herewith. It is requested that the same may please be forwarded to the wind/ solar generators for submission of the requisite details. From:-Pushpa.s(Manager(os),WRLDC,Mumbai) & Minaxi Garg(DGM),NLDC...Read More


True-Up for the FY 2010-11 and Aggregate Revenue Requirement for the FY 2012-13 of State Load Dispatch Centre (Case No. 1151 of 2011)....Read More


All Generators are requested to send the Day Ahead Declared Capacity in the Web based scheduling software before 10:00 Hrs.


UI ACCOUNT WEEK NO 30 FROM 24OCT2011 TO 30OCT2011 is uploaded.....more


Wind Energy Certificate for the month Nov-2011 is uploaded.....more


Line/Equipment OUtage Approved for the monthe Feb-2012.....more


MOM For RRF.....more


Mock trial for scheduling of wind and solar generation started from 01-July-2011....more