01

Function of ABT Meter

02

Quantity of Meter Installed to each constituent of State

03

Details associated with ABT  Meter.

As per GERC order date 11th Augsut-2006, Weekly UI calculations &    Reactive  Energy Account under Intra State ABT is to be done by State Load Dispatch Centre by measuring the energy exchanges at identified Locations. The ABT meter is installed at such identified locations for the purpose of measuring energy exchanges. The details associated with this location are put up on website for information to each concerned entity. These details shall not be used for the commercial purpose nor should be quoted anywhere. The SLDC does not take any responsibility for the damage or loss occurred due to above information.                    

01

  Function of ABT Meter

The ABT Energy Meters are specifically designed Three Phase, Four Wire static meters having accuracy class of 0.2S. Function of ABT meters is to measure the net energy transmitted in Wh in each 15-minute time block of real time along with the average frequency. This meters are designed to record reactive energy in VARh under the predefined high /low voltage condition.               

02

  Quantity of Meter Installed in State

Number of ABT Meters Installed as on 31st March- 2010
         
Sr No NAME OF ENTITIES NOS OF  ABT METER INSTALLED L & T MAKE SEMS MAKE
1 GSECL 262 94 168
2 UGVCL 70 0 70
3 MGVCL 74 3 71
4 DGVCL 70 0 70
5 PGVCL 117 102 15
6 CPP 41 7 34
7 MPP 41 41 0
8 IPP 71 8 63
9 WF 49 49 0
10 SECO 24 6 18
11 AECO 5 0 5
12 KPT 2 2 0
  TOTAL 826 312 514

 

Updated Details Of ABT Meters As On 31st March-10
             
Sr. No. Name of Sub Station / Power station Location Description Location ID Meter Number CTR PTR
 METER INSTALLED IN GUJARAT STATE ELECTRICITY COMPANY LTD.
1 Dhuvaran TPS 132 KV Side of GT-1 at Dhuvaran TPS(S) DTP1GTS1 GJ-2245-B 600/5 132000/110
2 Dhuvaran TPS 132 KV Side of GT-2 at Dhuvaran TPS(S) DTP1GTS2 GJ-2246-B 600/5 132000/110
3 Dhuvaran TPS 132 KV Side of GT-3 at Dhuvaran TPS(S) DTP1GTS3 GJ-2247-B 600/5 132000/110
4 Dhuvaran TPS 132 KV Side of GT-4 at Dhuvaran TPS(S) DTP1GTS4 GJ-2248-B 600/5 132000/110
5 Dhuvaran TPS 132 KV Side of GT-5 at Dhuvaran TPS(S) DTP1GTS5 GJ-2234-B 1200/5 132000/110
6 Dhuvaran TPS 132 KV Side of GT-6 at Dhuvaran TPS(S) DTP1GTS6 GJ-2237-B 1200/5 132000/110
7 Dhuvaran TPS 132 KV Side OF  12.5 MVA  SST-4 at Dhuvaran TPS(M) DTPSSTS4 GJ-2171-A 100/1 132000/110
8 Dhuvaran TPS 132 KV Side of SST-1 at Dhuvaran TPS(S) DTP1STS1 GJ-2226-B 100/5 132000/110
9 Dhuvaran TPS 132 KV Side of SST-2 at Dhuvaran TPS(S) DTP1STS2 GJ-2229-B 100/5 132000/110
10 Dhuvaran TPS 132 KV Side of SST-3 at Dhuvaran TPS(S) DTP1STS3 GJ-2238-B 300/5 132000/110
11 Dhuvaran TPS 132 KV BUS TIE Line -1 at Dhuvaran TPS (C) DTPBUTC1 GJ-2231-B 600/5 132000/110
12 Dhuvaran TPS 132 KV BUS TIE Line -2 at Dhuvaran TPS (C) DTPBUTC2 GJ-2244-B 600/5 132000/110
13 Dhuvaran TPS 132 KV BUS TIE Line -1 at Dhuvaran TPS (M) DTPBUTM1 GJ-2230-B 600/5 132000/110
14 Dhuvaran TPS 132 KV BUS TIE Line -2 at Dhuvaran TPS (M) DTPBUTM2 GJ-2241-B 600/5 132000/110
15 Dhuvaran TPS 132 KV Duvaran GBPS Line -1 at Dhuvaran TPS (C) DTPDGPC1 GJ-2217-B 600/5 132000/110
16 Dhuvaran TPS 132 KV Duvaran GBPS Line -2 at Dhuvaran TPS (C) DTPDGPC2 GJ-2220-B 600/5 132000/110
17 Dhuvaran TPS 132 KV Duvaran GBPS Line -1 at Dhuvaran TPS (M) DTPDGPM1 GJ-2216-B 600/5 132000/110
18 Dhuvaran TPS 132 KV Duvaran GBPS Line -2 at Dhuvaran TPS (M) DTPDGPM2 GJ-2219-B 600/5 132000/110
19 Dhuvaran TPS 132 KV Dhuvaran GBPS Line -3 at Dhuvaran TPS (C) DTPDGPC3 GJ-2221-B 600/5 132000/110
20 Dhuvaran TPS 132 KV Dhuvaran GBPS Line -4 at Dhuvaran TPS (C) DTPDGPC4 GJ-2223-B 600/5 132000/110
21 Dhuvaran TPS 132 KV Dhuvaran GBPS Line -3 at Dhuvaran TPS (M) DTPDGPM3 GJ-2218-B 600/5 132000/110
22 Dhuvaran TPS 132 KV Dhuvaran GBPS Line -4 at Dhuvaran TPS (M) DTPDGPM4 GJ-2222-B 600/5 132000/110
23 Dhuvaran TPS 132 KV Gotri Line -1 at Dhuvaran TPS (C) DTPGTRC1 GJ-2240-B 600/5 132000/110
24 Dhuvaran TPS 132 KV Gotri Line -2 at Dhuvaran TPS (C) DTPGTRC2 GJ-2250-B 600/5 132000/110
25 Dhuvaran TPS 132 KV Gotri Line -1 at Dhuvaran TPS (M) DTPGTRM1 GJ-2239-B 600/5 132000/110
26 Dhuvaran TPS 132 KV Gotri Line -2 at Dhuvaran TPS (M) DTPGTRM2 GJ-2242-B 600/5 132000/110
27 Dhuvaran TPS 132 KV Karamsad Line -1 at Dhuvaran TPS (C) DTPKRMC1 GJ-2233-B 600/5 132000/110
28 Dhuvaran TPS 132 KV Karamsad Line -2 at Dhuvaran TPS (C) DTPKRMC2 GJ-2236-B 600/5 132000/110
29 Dhuvaran TPS 132 KV Karamsad Line -1 at Dhuvaran TPS (M) DTPKRMM1 GJ-2232-B 600/5 132000/110
30 Dhuvaran TPS 132 KV Karamsad Line -2 at Dhuvaran TPS (M) DTPKRMM2 GJ-2235-B 600/5 132000/110
31 Dhuvaran TPS 132 KV Undel Line -1 at Dhuvaran TPS (C) DTPUNDC1 GJ-2173-A 600/1 132000/110
32 Dhuvaran TPS 132 KV Undel Line -1 at Dhuvaran TPS (M) DTPUNDM1 GJ-2172-A 600/1 132000/110
33 Dhuvaran TPS 132 KV Vatva Line -1 at Dhuvaran TPS (C) DTPVATC1 GJ-2225-B 600/5 132000/110
34 Dhuvaran TPS 132 KV Vatva Line -2 at Dhuvaran TPS (C) DTPVATC2 GJ-2228-B 600/5 132000/110
35 Dhuvaran TPS 132 KV Vatva Line -1 at Dhuvaran TPS (M) DTPVATM1 GJ-2224-B 600/5 132000/110
36 Dhuvaran TPS 132 KV Vatva Line -2 at Dhuvaran TPS (M) DTPVATM2 GJ-2227-B 600/5 132000/110
37 Duvaran GPS 132 KV Side of GT -1 at Duvaran GBPS-1 (S) DGP1GTS1 GJ-2190-A 600/1 132000/110
38 Duvaran GPS 132 KV Side of GT -2 at Duvaran GBPS-2 (S) DGP1GTS2 GJ-2195-A 600/1 132000/110
39 Duvaran GPS 132 KV Side of STG -1 at Duvaran GBPS-1 (S) DGP1SGS1 GJ-2189-A 300/1 132000/110
40 Duvaran GPS 132 KV Side of STG -2 at Duvaran GBPS-2 (S) DGP1SGS2 GJ-2194-A 300/1 132000/110
41 Duvaran GPS 132 KV Dhandhuka line -1 at Duvaran GBPS (C) DGPDHAC1 GJ-2185-A 600/1 132000/110
42 Duvaran GPS 132 KV Dhandhuka line -2 at Duvaran GBPS (C) DGPDHAC2 GJ-2182-A 600/1 132000/110
43 Duvaran GPS 132 KV Dhandhuka line -1 at Duvaran GBPS (M) DGPDHAM1 GJ-2184-A 600/1 132000/110
44 Duvaran GPS 132 KV Dhandhuka line -2 at Duvaran GBPS (M) DGPDHAM2 GJ-2174-A 600/1 132000/110
45 Duvaran GPS 132 KV Dhuvaran TPS Line -1 at Duvaran GBPS (C) DGPDTPC1 GJ-2177-A 600/1 132000/110
46 Duvaran GPS 132 KV Dhuvaran TPS Line -2 at Duvaran GBPS (C) DGPDTPC2 GJ-2180-A 600/1 132000/110
47 Duvaran GPS 132 KV Dhuvaran TPS Line -3 at Duvaran GBPS (C) DGPDTPC3 GJ-2188-A 600/1 132000/110
48 Duvaran GPS 132 KV Dhuvaran TPS Line -4 at Duvaran GBPS (C) DGPDTPC4 GJ-2186-A 600/1 132000/110
49 Duvaran GPS 132 KV Dhuvaran TPS Line -1 at Duvaran GBPS (M) DGPDTPM1 GJ-2176-A 600/1 132000/110
50 Duvaran GPS 132 KV Dhuvaran TPS Line -2 at Duvaran GBPS (M) DGPDTPM2 GJ-2179-A 600/1 132000/110
51 Duvaran GPS 132 KV Dhuvaran TPS Line -3 at Duvaran GBPS (M) DGPDTPM3 GJ-2187-A 600/1 132000/110
52 Duvaran GPS 132 KV Dhuvaran TPS Line -4 at Duvaran GBPS (M) DGPDTPM4 GJ-2178-A 600/1 132000/110
53 Duvaran GPS 132 KV Limbadi line -1 at Duvaran GBPS (C) DGPLMDC1 GJ-2192-A 600/1 132000/110
54 Duvaran GPS 132 KV Limbadi line -2 at Duvaran GBPS (C) DGPLMDC2 GJ-2191-A 600/1 132000/110
55 Duvaran GPS 132 KV Limbadi line -1 at Duvaran GBPS (M) DGPLMDM1 GJ-2193-A 600/1 132000/110
56 Duvaran GPS 132 KV Limbadi line -2 at Duvaran GBPS (M) DGPLMDM2 GJ-2183-A 600/1 132000/110
57 Gandhinagar TPS 220 KV Side of GT-1 at Gandhinagar TPS GTP2GTS1 GJ-0425-A 500/1 220000/110
58 Gandhinagar TPS 220 KV Side of GT-2 at Gandhinagar TPS GTP2GTS2 GJ-0429-A 500/1 220000/110
59 Gandhinagar TPS 220 KV Side of GT-3 at Gandhinagar TPS GTP2GTS3 GJ-0418-A 800/1 220000/110
60 Gandhinagar TPS 220 KV Side of GT-4 at Gandhinagar TPS GTP2GTS4 GJ-0396-A 800/1 220000/110
61 Gandhinagar TPS 220 KV Side of GT-5 at Gandhinagar TPS GTP2GTS5 GJ-0394-A 1000/1 220000/110
62 Gandhinagar TPS 220 KV Side of ST-2A at Gandhinagar TPS GTP2SAS2 GJ-0393-A 100/1 220000/110
63 Gandhinagar TPS 220 KV Side of ST-2B at Gandhinagar TPS GTP2SBS2 GJ-0422-A 100/1 220000/110
64 Gandhinagar TPS 220 KV Side of ST-1 at Gandhinagar TPS GTP2STS1 GJ-0427-A 75/1 220000/110
65 Gandhinagar TPS 220 KV Side of ST-3 at Gandhinagar TPS GTP2STS3 GJ-0417-A 100/1 220000/110
66 Gandhinagar TPS 220 KV Chhagtral line -1 at Gandhinagar TPS(C) GTPCHHC1 GJ-0399-A 1000/1 220000/110
67 Gandhinagar TPS 220 KV Chhatral Line -2 at Gandhinagar TPS(C) GTPCHHC2 GJ-0383-A 1000/1 220000/110
68 Gandhinagar TPS 220 KV Chhatral Line -1 at Gandhinagar TPS(M) GTPCHHM1 GJ-0401-A 1000/1 220000/110
69 Gandhinagar TPS 220 KV Chhatral Line -2 at Gandhinagar TPS(M) GTPCHHM2 GJ-0392-A 1000/1 220000/110
70 Gandhinagar TPS 220 KV Jamla Line -1 at Gandhinagar TPS(C) GTPJMLC1 GJ-0420-A 1000/1 220000/110
71 Gandhinagar TPS 220 KV Jamla Line -2 at Gandhinagar TPS(C) GTPJMLC2 GJ-0395-A 1000/1 220000/110
72 Gandhinagar TPS 220 KV Jamla Line -1 at Gandhinagar TPS(M) GTPJMLM1 GJ-0415-A 1000/1 220000/110
73 Gandhinagar TPS 220 KV Jamla Line -2 at Gandhinagar TPS(M) GTPJMLM2 GJ-0416-A 1000/1 220000/110
74 Gandhinagar TPS 220 KV Mehsana Line -1 at Gandhinagar TPS(C) GTPMSNC1 GJ-0419-A 1000/1 220000/110
75 Gandhinagar TPS 220 KV Mehsana Line -2 at Gandhinagar TPS(C) GTPMSNC2 GJ-0414-A 1000/1 220000/110
76 Gandhinagar TPS 220 KV Mehsana Line -1 at Gandhinagar TPS(M) GTPMSNM1 GJ-0421-A 1000/1 220000/110
77 Gandhinagar TPS 220 KV Mehsana Line -2 at Gandhinagar TPS(M) GTPMSNM2 GJ-0424-A 1000/1 220000/110
78 Gandhinagar TPS 220 KV Ranasan Line -1 at Gandhinagar TPS(C) GTPRSNC1 GJ-0382-A 1000/1 220000/110
79 Gandhinagar TPS 220 KV Ranasan Line -2 at Gandhinagar TPS(C) GTPRSNC2 GJ-0384-A 1000/1 220000/110
80 Gandhinagar TPS 220 KV Ranasan Line -1 at Gandhinagar TPS(M) GTPRSNM1 GJ-0430-A 1000/1 220000/110
81 Gandhinagar TPS 220 KV Ranasan Line -2 at Gandhinagar TPS(M) GTPRSNM2 GJ-0400-A 1000/1 220000/110
82 Gandhinagar TPS 220 KV Soja Line -1 at Gandhinagar TPS(C) GTPSOJC1 GJ-0428-A 1000/1 220000/110
83 Gandhinagar TPS 220 KV Soja Line -2 at Gandhinagar TPS(C) GTPSOJC2 GJ-0397-A 1000/1 220000/110
84 Gandhinagar TPS 220 KV Soja Line -1 at Gandhinagar TPS(M) GTPSOJM1 GJ-0426-A 1000/1 220000/110
85 Gandhinagar TPS 220 KV Soja Line -2 at Gandhinagar TPS(M) GTPSOJM2 GJ-0398-A 1000/1 220000/110
86 Kachchh TPS 220 KV Side of GT-1 at Kachchh TPS(S) KTP2GTS1 GJ-2039-A 300/1 220000/110
87 Kachchh TPS 220 KV Side of GT-2 at Kachchh TPS(S) KTP2GTS2 GJ-2040-A 300/1 220000/110
88 Kachchh TPS 220 KV Side of GT-3 at Kachchh TPS(S) KTP2GTS3 GJ-2041-A 300/1 220000/110
89 Kachchh TPS 220 KV Side of GT-4 at Kachchh TPS(S) KTP2GTS4 GJ-2042-A 300/1 220000/110
90 Kachchh TPS 220 KV Side of ICT-1 at Kachchh TPS(M) KTP2ICM1 GJ-2045-A 150/1 220000/110
91 Kachchh TPS 220 KV Side of ST-1 at Kachchh TPS(S) KTP2STS1 GJ-2043-A 150/1 220000/110
92 Kachchh TPS 220 KV Side of ST-2 at Kachchh TPS(S) KTP2STS2 GJ-2044-A 150/1 220000/110
93 Kachchh TPS 66 KV Side of ICT-1 at Kachchh TPS(S) KTP6ICS1 GJ-2046-A 600/1 66000/110
94 Kachchh TPS 220 KV Kukma Line -1 at Kachchh TPS (C) KTPKUKC1 GJ-2050-A 600/1 220000/110
95 Kachchh TPS 220 KV Kukma Line -2 at Kachchh TPS (C) KTPKUKC2 GJ-2051-A 600/1 220000/110
96 Kachchh TPS 220 KV Kukma Line -1 at Kachchh TPS (M) KTPKUKM1 GJ-2047-A 600/1 220000/110
97 Kachchh TPS 220 KV Kukma Line -2 at Kachchh TPS (M) KTPKUKM2 GJ-2048-A 600/1 220000/110
98 Kachchh TPS 220 KV Akrimota TPS Line -1 at Kachchh TPS (C) KTPATPC1 GJ-2057-A 600/1 220000/110
99 Kachchh TPS 220 KV Akrimota TPS Line -2 at Kachchh TPS (C) KTPATPC2 GJ-2058-A 600/1 220000/110
100 Kachchh TPS 220 KV Akrimota TPS Line -1 at Kachchh TPS (M) KTPATPM1 GJ-2055-A 600/1 220000/110
101 Kachchh TPS 220 KV Akrimota TPS Line -2 at Kachchh TPS (M) KTPATPM2 GJ-2056-A 600/1 220000/110
102 Kachchh TPS 220 KV Nakhatrana Line -1 at Kachchh TPS (C) KTPNKTC1 GJ-2052-A 600/1 220000/110
103 Kachchh TPS 220 KV Nakhatrana Line -2 at Kachchh TPS (C) KTPNKTC2 GJ-2054-A 600/1 220000/110
104 Kachchh TPS 220 KV Nakhatrana Line -1 at Kachchh TPS (M) KTPNKTM1 GJ-2049-A 600/1 220000/110
105 Kachchh TPS 220 KV Nakhatrana Line -2 at Kachchh TPS (M) KTPNKTM2 GJ-2053-A 600/1 220000/110
106 Kadana (Hyd) 220 KV Side of GT-1 at Kadana(S) KHP2GTS1 GJ-0576-A 200/1 220000/110
107 Kadana (Hyd) 220 KV Side of GT-2 at Kadana(S) KHP2GTS2 GJ-0577-A 200/1 220000/110
108 Kadana (Hyd) 220 KV Side of GT-3 at Kadana(S) KHP2GTS3 GJ-0578-A 200/1 220000/110
109 Kadana (Hyd) 220 KV Side of GT-4 at Kadana(S) KHP2GTS4 GJ-0579-A 200/1 220000/110
110 Kadana (Hyd) 220 KV Side of SST-1 at Kadana(S) KHP2STS1 GJ-0580-A 200/1 220000/110
111 Kadana (Hyd) 220 KV  Dhansura line-1 at Kadana HPS(C) KHPDHNC1 GJ-0573-A 800/1 220000/110
112 Kadana (Hyd) 220 KV  Dhansura line-2 at Kadana HPS(C) KHPDHNC2 GJ-0575-A 800/1 220000/110
113 Kadana (Hyd) 220 KV  Dhansura line-1 at Kadana HPS(M) KHPDHNM1 GJ-0500-A 800/1 220000/110
114 Kadana (Hyd) 220 KV  Dhansura line-2 at Kadana HPS(M) KHPDHNM2 GJ-0574-A 800/1 220000/110
115 Kadana (Hyd) 220 KV  Godhara line-1 at Kadana HPS(C) KHPGDHC1 GJ-0469-A 800/1 220000/110
116 Kadana (Hyd) 220 KV  Godhara line-2 at Kadana HPS(C) KHPGDHC2 GJ-0572-A 800/1 220000/110
117 Kadana (Hyd) 220 KV  Godhara line-1 at Kadana HPS(M) KHPGDHM1 GJ-0468-A 800/1 220000/110
118 Kadana (Hyd) 220 KV  Godhara line-2 at Kadana HPS(M) KHPGDHM2 GJ-0571-A 800/1 220000/110
119 Panam 11 KV  Shehra  line-1 at Panam LBPH(C) PANSHRC1 GJ-0007-B 300/5 11000/110
120 Panam 11 KV  Shehra  line-1 at Panam LBPH(M) PANSHRM1 GJ-0010-B 300/5 11000/110
121 Sikka TPS 132 KV Side of GT-1 at Sikka TPS(S) STP1GTS1 GJ-2061-A 1000/1 132000/110
122 Sikka TPS 132 KV Side of GT-2 at Sikka TPS(S) STP1GTS2 GJ-2062-A 1000/1 132000/110
123 Sikka TPS 132 KV Side of ICT-1 at Sikka TPS(M) STP1ICM1 GJ-2077-A 300/1 132000/110
124 Sikka TPS 132 KV Side of SST-1 at Sikka TPS(S) STP1STS1 GJ-2063-A 150/1 132000/110
125 Sikka TPS 132 KV Side of SST-2 at Sikka TPS(S) STP1STS2 GJ-2064-A 150/1 132000/110
126 Sikka TPS 66 KV Side of ICT-1 at Sikka TPS(S) STP6ICS1 GJ-2078-A 600/1 66000/110
127 Sikka TPS 132 KV Bhatia Line - 1 at Sikka TPS(C) STPBHTC1 GJ-2066-A 1000/1 132000/110
128 Sikka TPS 132 KV Bhatia Line - 1 at Sikka TPS(M) STPBHTM1 GJ-2065-A 1000/1 132000/110
129 Sikka TPS 132 KV Dhrol Line - 1 at Sikka TPS(C) STPDHLC1 GJ-2070-A 1000/1 132000/110
130 Sikka TPS 132 KV Jamnagar Line - 2 at Sikka TPS(C) STPJMNC2 GJ-2072-A 1000/1 132000/110
131 Sikka TPS 132 KV Dhrol Line - 1 at Sikka TPS(M) STPDHLM1 GJ-2069-A 1000/1 132000/110
132 Sikka TPS 132 KV Jamnagar Line - 2 at Sikka TPS(M) STPJMNM2 GJ-2071-A 1000/1 132000/110
133 Sikka TPS 132 KV Nagedi Line - 1 at Sikka TPS(C) STPNGDC1 GJ-2076-A 1000/1 132000/110
134 Sikka TPS 132 KV Nagedi Line - 1 at Sikka TPS(M) STPNGDM1 GJ-2075-A 1000/1 132000/110
135 Sikka TPS 132 KV Ranavav Line - 1 at Sikka TPS(C) STPRNVC1 GJ-2068-A 1000/1 132000/110
136 Sikka TPS 132 KV Ranavav Line - 1 at Sikka TPS(M) STPRNVM1 GJ-2067-A 1000/1 132000/110
137 Sikka TPS 132 KV RPL Line - 1 at Sikka TPS(C) STPRPLC1 GJ-2074-A 1000/1 132000/110
138 Sikka TPS 132 KV RPL Line - 1 at Sikka TPS(M) STPRPLM1 GJ-2073-A 1000/1 132000/110
139 Ukai (Mini Hyd) 66KV Side of GT-1 at LBCHP Ukai(S) LBC6GTS1 GJ-0064-A 75/1 66000/110
140 Ukai (Mini Hyd) 66 KV Side of GT-2 at LBCHP Ukai(S) LBC6GTS2 GJ-0069-A 75/1 66000/110
141 Ukai (Mini Hyd) 66kV UHPS line-1 at LBCHP Ukai (C) LBCUHPC1 GJ-0073-A 75/1 66000/110
142 Ukai (Mini Hyd) 66kV UHPS line-2 at LBCHP Ukai (C) LBCUHPC2 GJ-0072-A 75/1 66000/110
143 Ukai (Mini Hyd) 66kV UHPS line-1 at LBCHP Ukai (M) LBCUHPM1 GJ-0070-A 75/1 66000/110
144 Ukai (Mini Hyd) 66kV UHPS line-2 at LBCHP Ukai (M) LBCUHPM2 GJ-0071-A 75/1 66000/110
145 Ukai Hydro 220 KV Side of GT-1 at Ukai Hydro UHP2GTS1 GJ-0065-A 500/1 220000/110
146 Ukai Hydro 220 KV Side of GT-2 at Ukai Hydro UHP2GTS2 GJ-0066-A 500/1 220000/110
147 Ukai Hydro 220 KV Side of GT-3 at Ukai Hydro UHP2GTS3 GJ-0067-A 500/1 220000/110
148 Ukai Hydro 220 KV Side of GT-4 at Ukai Hydro UHP2GTS4 GJ-0068-A 500/1 220000/110
149 Ukai Hydro 220 KV Side of ICT-1at Ukai Hydro UHP2ICS1 GJ-0084-A 500/1 220000/110
150 Ukai Hydro 220 KV Side of ICT-2 at Ukai Hydro UHP2ICS2 GJ-0085-A 500/1 220000/110
151 Ukai Hydro 66 KV Side of ICT-1 at Ukai Hydro UHP6ICS1 GJ-0134-A 600/1 66000/110
152 Ukai Hydro 66 KV Side of ICT-2 at Ukai Hydro UHP6ICS2 GJ-0135-A 600/1 66000/110
153 Ukai Hydro 220 KV  Achhslia  line-1 at Ukai Hydro (C) UHPACHC1 GJ-0091-A 1000/1 220000/110
154 Ukai Hydro