Power Supply and Generation Data for 04- Jan - 2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3484 |
2040 |
2499 |
8023 |
20.00 |
|
Min. Demand catered in MW |
2954 |
1837 |
2227 |
7018 |
5.00 |
|
Energy Catered in Mus. |
79.079 |
50.094 |
51.958 |
181.131 |
|
|
Schedule Share |
Central Sector + Bilateral (SCH) |
53.252 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.430 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.41 |
48.13 |
49.61 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
7.375 |
9.111 |
24.084 |
10.592 |
51.162 |
|
UGVCL |
3.644 |
2.390 |
28.863 |
7.685 |
42.582 |
|
MGVCL |
2.843 |
5.330 |
2.905 |
7.125 |
18.203 |
|
DGVCL |
4.064 |
5.057 |
1.828 |
14.948 |
25.897 |
|
TOTAL |
17.926 |
21.888 |
57.680 |
40.350 |
137.844 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
77.305 mus |
|
B |
DAILY PLF |
76.34% |
|
C |
DAILY PAF |
84.89% |
|
D |
CUMMULATIVE PLF |
74.02% |
|
E |
CUMMULATIVE PAF |
81.15% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
79.64% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
78.53% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
74.31% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-73 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2335 |
-73 |
9828 |
|
Planned Outage |
120 |
0 |
100 |
|
|
|
|
Force Outage |
512 |
60 |
344 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Restricted Outage |
227 |
1 |
88 |
|
|
|
|
Gen. / Flow 7hrs. |
3360 |
81 |
2195 |
2173 |
-73 |
7809 |