Power Supply and Generation Data for 07- Jan - 2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

            

1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered in MW

3515

2605

2013

8133

20.00

Min. Demand catered in MW 

3260

2165

1684

7109

6.00

Energy Catered In MUs.

80.897

57.782

45.721

184.400

 

Central Sector + Bilateral(SCH)

52.260

 

2. BILATERAL TRANSACATION DATA IN Mus:

Bilateral Sale   

1.277

Bilateral Purchase

0.000


 

3. FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.02

48.81

49.32

 

4. DISCOM WISE ENERGY IN Mus.

    DISCOM

        JGY

     URB/TWN

      AGR

        IND

      TOTAL

PGVCL 7.11 9.059 23.659 10.254 50.082
UGVCL 3.515 2.552 28.465 8.510 43.042
MGVCL 2.808 5.460 3.021 7.36 18.649
DGVCL 3.752 5.301 1.981 15.67 26.704
TOTAL  17.185 22.372 57.126 41.794 138.477

 

5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

79.044 mus

B

DAILY PLF

  78.06 %

C

DAILY PAF

  84.89 %

D

CUMMULATIVE PLF

  74.06 %

E

CUMMULATIVE PAF

  81.16 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  77.96 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... 

  79.73 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  74.36 %

 

 6. Generation available in MW at 07.00 Hours                

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4219

547

2727

3233

-8

10417

Capacity Available

4219

547

2727

2261

- 8

9754

Planned Outage

120

0

  0

 

 

 

Force Outage

512

60

663

 

 

 

Available

0

405

0

 

 

 

Rest Outage

298

1

-252

 

 

 

Gen/Flow at 7hrs.

3289

81

2316

2214

-8

7900