Power Supply and Generation Data for 07- Jan - 2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3515 |
2605 |
2013 |
8133 |
20.00 |
|
Min. Demand catered in MW |
3260 |
2165 |
1684 |
7109 |
6.00 |
|
Energy Catered In MUs. |
80.897 |
57.782 |
45.721 |
184.400 |
|
|
|
Central Sector + Bilateral(SCH) |
52.260 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
1.277 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.02 |
48.81 |
49.32 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
| PGVCL | 7.11 | 9.059 | 23.659 | 10.254 | 50.082 |
| UGVCL | 3.515 | 2.552 | 28.465 | 8.510 | 43.042 |
| MGVCL | 2.808 | 5.460 | 3.021 | 7.36 | 18.649 |
| DGVCL | 3.752 | 5.301 | 1.981 | 15.67 | 26.704 |
| TOTAL | 17.185 | 22.372 | 57.126 | 41.794 | 138.477 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
79.044 mus |
|
B |
DAILY PLF |
78.06 % |
|
C |
DAILY PAF |
84.89 % |
|
D |
CUMMULATIVE PLF |
74.06 % |
|
E |
CUMMULATIVE PAF |
81.16 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
77.96 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.73 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
74.36 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-8 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2261 |
- 8 |
9754 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
512 |
60 |
663 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
298 |
1 |
-252 |
|
|
|
|
Gen/Flow at 7hrs. |
3289 |
81 |
2316 |
2214 |
-8 |
7900 |