Power Supply and Generation Data for 30-Jan-2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3401 |
2559 |
2402 |
8362 |
19.30 |
|
Min. Demand catered in MW |
3415 |
2092 |
2002 |
7509 |
4.00 |
|
Energy Catered in Mus. |
81.941 |
56.579 |
50.495 |
189.015 |
|
|
Schedule Share |
Central Sector + Bilateral |
56.863 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACTION DATA IN Mus :
|
Bilateral Sale |
0.153 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.34 |
48.93 |
49.52 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.46 |
12.313 |
16.569 |
10.995 |
48.337 |
|
UGVCL |
4.682 |
3.470 |
25.032 |
7.639 |
40.823 |
|
MGVCL |
3.045 |
5.938 |
2.915 |
8.381 |
20.279 |
|
DGVCL |
4.381 |
5.043 |
2.128 |
14.907 |
26.459 |
|
TOTAL |
20.568 |
26.764 |
46.644 |
41.922 |
135.898 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
81.847 mus |
|
B |
DAILY PLF |
80.83 % |
|
C |
DAILY PAF |
86.96 % |
|
D |
CUMULATIVE PLF |
74.20 % |
|
E |
CUMULATIVE PAF |
81.17 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
75.87 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
82.20 % |
|
H |
CUMULATIVE PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS... |
74.63 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-7 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2449 |
-7 |
9942 |
|
Planned Outage |
240 |
0 |
162 |
|
|
|
|
Force Outage |
502 |
60 |
160 |
|
|
|
|
Available |
155 |
480 |
0 |
|
|
|
|
Restricted Outage |
121 |
1 |
-100 |
|
|
|
|
Gen. / Flow 7hrs. |
3201 |
6 |
2505 |
2204 |
-7 |
7916 |
|
|
3653 |
81 |
2412 |
2169 |
16 |
8315 |