Power Supply and Generation Data for 30-Jan-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

                       

1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3401

2559

2402

8362

19.30

Min. Demand catered   in  MW

3415

2092

2002

7509

4.00

Energy Catered   in Mus.

81.941

56.579

50.495

189.015

Schedule Share

Central Sector + Bilateral

56.863

 

 

 

 

2. BILATERAL TRANSACTION DATA IN Mus :

Bilateral Sale   

0.153

Bilateral Purchase

0.000

 

3. FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.34

48.93

49.52

      4.  DISCOM-WISE ENERGY IN MUs

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.46

12.313

16.569

10.995

48.337

UGVCL

4.682

3.470

25.032

7.639

40.823

MGVCL

3.045

5.938

2.915

8.381

20.279

DGVCL

4.381

5.043

2.128

14.907

26.459

TOTAL

20.568

26.764

46.644

41.922

135.898

      5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  81.847 mus

B

DAILY PLF

  80.83 %

C

DAILY PAF

  86.96 %

D

CUMULATIVE PLF

  74.20 %

E

CUMULATIVE PAF

  81.17 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  75.87 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

  82.20 %

H

CUMULATIVE PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

  74.63 %

        6. Generation available in MW at 07.00 Hours                 

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4219

547

2727

3233

-7

10417

Capacity Available

4219

547

2727

2449

-7

9942

Planned Outage

240

0

162

 

 

 

Force Outage

502

60

160

 

 

 

Available  

155

480

  0

 

 

 

Restricted Outage

121

1

-100

 

 

 

Gen. / Flow 7hrs.

3201

 6

2505

2204

-7

7916

 

3653

81

2412

2169

16

8315