Power Supply and Generation Data for 13 April 2007

Home                    Past data                   Monthly report

 

      1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3549

2864

2156

8530

01.00

Min. Demand catered   in  MW

3552

2787

1468

7984

18.30

Energy Catered   in Mus.

88.368

53.629

57.226

199.223

Schedule Share

Central Sector + Bilateral

51.634

 

 

 

 2.  BILATERAL TRANSACTION DATA IN Mus :

Bilateral Sale   

0.000

Bilateral Purchase

0.829

 3.  FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

49.82

48.71

49.14

       4. Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

7.52

Hours

MGVCL

7.46

Hours

DGVCL

7.37

Hours

PGVCL 

7.43

Hours

Average

7.45

Hours

       5.  Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

       85.988 mus

B

DAILY PLF

81.05 %

C

DAILY PAF

92.48%

D

CUMULATIVE PLF

74.66 %

E

CUMULATIVE PAF

80.67%

F

AVAILABILITY FACTOR AT 07.00 HOURS.

76.81 %

G

DAILY PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

  81.05 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

 74.69 %

       6.  Generation available in MW at 07.00 Hours                  

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4489

547

2708

* 2839

50

10223

Capacity Available

4489

547

2708

2140

50

9884

Planned Outage

120

0

    0

 

 

 

Force Outage

366

60

         220

 

 

 

Available  

0

0

 0

 

 

 

Restricted Outage

422

408

  271

 

 

 

Gen. / Flow 7hrs.

3581

79

2217

2523

50

   8400

 

.