1. Max. Demand / Energy Catered in
Gujarat System.
|
MW
FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in
MW |
3569 |
3074 |
1675 |
8318 |
15.00 |
|
Min. Demand catered
in MW |
3327 |
2974 |
1400 |
7701 |
3.00 |
|
Energy Catered in
Mus. |
86.170 |
55.568 |
50.573 |
192.311 |
|
Schedule Share |
Central
Sector + Bilateral |
52.762 |
|
|
|
|
2. BILATERAL TRANSACATION DATA IN
Mus:
|
Bilateral Sale
|
0.000 |
|
Bilateral Purchase |
0.900 |
3. FREQUENCY :
|
Instantaneous
Maximum |
Instantaneous
Minimum |
Average of the
Day. |
|
50.41 |
48.83 |
49.57 |
4.
Average Supply Hours as advice by SLDC Gotri to Agriculture
Areas.
UGVCL |
8.25 |
Hours |
|
MGVCL |
8.30 |
Hours |
|
DGVCL |
10.30 |
Hours |
|
PGVCL
|
8.28 |
Hours |
|
Average |
8.58 |
Hours |
5. Plant Load Factor and
Plant Availability Factor.
|
A |
GSEC
ENERGY FOR PLF (EXCLUDING HYDRO) |
84.141 mus |
|
B |
DAILY
PLF |
79.31
% |
|
C |
DAILY
PAF |
90.38
% |
|
D |
CUMMULATIVE PLF |
75.46
% |
|
E |
CUMMULATIVE PAF |
80.76
% |
|
F |
AVAILIBILITY FACTOR AT 07.00
HOURS. |
78.03
% |
|
G |
DAILY PLF
OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS
IS... |
79.84 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH
BACKDOWN AND AVAILABLE UNITS IS... |
75.49% |
6. Generation available in MW at 07.00
Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC
(GUJ+DD+DNH) |
Bilateral |
TOTAL
GUJARAT |
|
Total Capacity |
4489 |
547 |
2708 |
2839 |
14 |
10223 |
|
Capacity Available |
4489 |
547 |
2708 |
2059 |
14 |
9813 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
334 |
60 |
15 |
|
|
|
|
Available
|
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
397 |
413 |
330 |
|
|
|
|
Gen. / Flow 7hrs. |
3638 |
74 |
2363 |
2243 |
14 |
8318 |
|