1. Max. Demand / Energy Catered in
Gujarat System.
|
MW
FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in
MW |
2985 |
2737 |
2168 |
7890 |
10.00 |
|
Min. Demand catered
in MW |
3148 |
2688 |
1713 |
7549 |
19.00 |
|
Energy Catered in
Mus. |
77.175 |
52.498 |
56.266 |
185.939 |
|
Schedule Share |
Central Sector +
Bilateral |
47.782 |
|
|
|
|
2. BILATERAL TRANSACATION DATA IN
Mus:
|
Bilateral Sale
|
0.000
|
|
Bilateral Purchase |
0.900 |
3. FREQUENCY :
|
Instantaneous
Maximum |
Instantaneous
Minimum |
Average of the
Day. |
|
50.00 |
48.70 |
49.18 |
4.
Average Supply Hours as advice by SLDC Gotri to Agriculture
Areas.
UGVCL |
6.53 |
Hours |
|
MGVCL |
6.00 |
Hours |
|
DGVCL |
6.08 |
Hours |
|
PGVCL
|
5.01 |
Hours |
|
Average |
6.00 |
Hours |
5. Plant Load Factor and
Plant Availability Factor.
|
A |
GSEC
ENERGY FOR PLF (EXCLUDING HYDRO) |
74.863mus |
|
B |
DAILY
PLF |
70.56% |
|
C |
DAILY
PAF |
79.99 % |
|
D |
CUMMULATIVE PLF |
72.40
% |
|
E |
CUMMULATIVE PAF |
80.61
% |
|
F |
AVAILIBILITY FACTOR AT 07.00
HOURS. |
69.15
% |
|
G |
DAILY PLF
OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS
IS... |
70.56 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH
BACKDOWN AND AVAILABLE UNITS IS... |
72.44
% |
6. Generation available in MW at 07.00
Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC
(GUJ+DD+DNH) |
Bilateral |
TOTAL
GUJARAT |
|
Total Capacity |
4489 |
547 |
2708 |
2839 |
50 |
10223 |
|
Capacity Available |
4489 |
547 |
2708 |
2131 |
50 |
9875 |
|
Planned Outage |
120 |
0 |
78 |
|
|
|
|
Force Outage |
696 |
60 |
188 |
|
|
|
|
Available
|
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
449 |
410 |
242 |
|
|
|
|
Gen. / Flow 7hrs. |
3224 |
77 |
2200 |
2477 |
50 |
7978 |
|