Power Supply and Generation Data for 9 April 2007

Home                    Past data                   Monthly report

 

1.        Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW                

3442

2533

2127

8102

4.00

Min. Demand catered in MW   

3230

2674

1712

7616

19.30

Energy Catered in MUs.

80.779

49.918

58.890

189.587

Schedule Share

Central Sector + Bilateral

50.967

 2.    BILATERAL TRANSACTION DATA IN MUs:

Bilateral Sale   

0.000

Bilateral Purchase

0.900

 3.    FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

49.96

48.79

49.27

 4.        Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

6.28

Hours

MGVCL

6.41

Hours

DGVCL

6.00

Hours

PGVCL 

6.16

Hours

Average

6.21

Hours

 5.        Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

78.435 MUs

B

DAILY PLF

73.93%

C

DAILY PAF

  84.16 %

D

CUMMULATIVE PLF

 72.52 %

E

CUMMULATIVE PAF

 80.61 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

 71.90  %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

    73.93  %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

 72.56  %

 6.         Generation available in MW at 07.00 Hours

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC (GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Tot    Total Capacity

4489

547

2708

* 2839

50

10223

Capacity Available

4489

547

2708

2207

50

9951

Planned Outage

120

0

    78

 

 

 

Force Outage

498

60

 140

 

 

 

Available

0

0

 0

 

 

 

Restricted Outage

519

411

  232

 

 

 

Gen/Flow at 7hrs.

3352

76

2258

2397

50

8083