Power Supply and Generation Data for 1-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3276 |
2532 |
2616 |
8424 |
07.00 |
|
Min. Demand catered in MW |
3055 |
2516 |
2109 |
7680 |
19.00 |
|
Energy Catered in Mus. |
77.543 |
58.909 |
59.394 |
195.846 |
|
|
Schedule Share |
Central Sector + Bilateral |
44.420 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.27 |
48.81 |
49.52 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.993 |
11.546 |
18.318 |
12.425 |
51.282 |
|
UGVCL |
4.552 |
3.266 |
23.798 |
8.584 |
40.200 |
|
MGVCL |
2.835 |
5.673 |
3.439 |
7.428 |
19.375 |
|
DGVCL |
4.159 |
5.152 |
2.232 |
15.227 |
26.770 |
|
TOTAL |
20.539 |
25.637 |
47.787 |
43.664 |
137.627 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
74.787Mus |
|
B |
DAILY PLF |
73.86% |
|
C |
DAILY PAF |
80.48% |
|
D |
CUMMULATIVE PLF |
73.86% |
|
E |
CUMMULATIVE PAF |
81.72% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
76.67% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
74.47% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
74.47% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
15 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1991 |
15 |
9437 |
|
Planned Outage |
200 |
0 |
78 |
|
|
|
|
Force Outage |
475 |
120 |
175 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
144 |
347 |
154 |
|
|
|
|
Gen. / Flow 7hrs. |
3400 |
80 |
2320 |
2464 |
15 |
8264 |