Power Supply and Generation Data for 3-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3532 |
2182 |
2868 |
8582 |
07.00 |
|
Min. Demand catered in MW |
3244 |
2517 |
2206 |
7967 |
18.30 |
|
Energy Catered in Mus. |
81.542 |
56.086 |
59.298 |
196.926 |
|
|
Schedule Share |
Central Sector + Bilateral |
44.284 |
|||
|
|
|
|
|||
2. BILATERAL TRANSCATION DATA IN Mus :
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.31 |
48.95 |
49.65 |
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.831 |
11.473 |
18.331 |
12.725 |
51.360 |
|
UGVCL |
4.451 |
3.245 |
23.830 |
8.014 |
39.540 |
|
MGVCL |
2.836 |
5.827 |
3.584 |
7.654 |
19.901 |
|
DGVCL |
4.188 |
5.357 |
2.256 |
15.835 |
27.636 |
|
TOTAL |
20.306 |
25.902 |
48.001 |
44.228 |
138.437 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
79.217 MUS |
|
B |
DAILY PLF |
78.23 % |
|
C |
DAILY PAF |
84.11 % |
|
D |
CUMMULATIVE PLF |
79.29 % |
|
E |
CUMMULATIVE PAF |
81.73 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
73.89 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.02% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
77.94 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
14 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2070 |
14 |
9516 |
|
Planned Outage |
200 |
0 |
78 |
|
|
|
|
Force Outage |
540 |
120 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
205 |
274 |
425 |
|
|
|
|
Gen. / Flow 7hrs. |
3274 |
153 |
2174 |
2806 |
14 |
8407 |