Power Supply and Generation Data for 4-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3335 |
2274 |
2982 |
8591 |
07.00 |
|
Min. Demand catered in MW |
2786 |
2309 |
1014 |
6109 |
19.00 |
|
Energy Catered in Mus |
74.154 |
52.857 |
55.721 |
182.732 |
|
|
Schedule Share |
Central Sector + Bilateral |
45.470 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.36 |
48.99 |
49.87 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.668 |
11.460 |
17.374 |
12.637 |
50.139 |
|
UGVCL |
3.345 |
2.581 |
16.992 |
7.858 |
30.776 |
|
MGVCL |
2.154 |
5.036 |
3.074 |
6.934 |
17.198 |
|
DGVCL |
4.095 |
5.228 |
2.291 |
15.453 |
27.067 |
|
TOTAL |
18.262 |
24.305 |
39.731 |
42.882 |
125.180 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
72.362 MUS |
|
b |
DAILY PLF |
71.46 % |
|
C |
DAILY PAF |
82.54 % |
|
D |
CUMMULATIVE PLF |
75.84 % |
|
E |
CUMMULATIVE PAF |
81.73 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
59.17 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
76.13% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
77.49 % |
6. Generation available in MW at 07.00 Hours
GUJARAT |
PLF Thermal |
Hydro |
PVT+(CPP+215 ) |
CEN.SEC(GUJ+DD+DNH) |
Bileteral |
TOTAL GUJARAT |
Tot Total Capacity |
4219 |
547 |
2727 |
* 3001 |
14 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1972 |
14 |
9465 |
|
Planned Outage |
207 |
0 |
78 |
|
|
|
|
Force Outage |
750 |
120 |
50 |
|
|
|
|
Available |
272 |
0 |
436 |
|
|
|
|
Rest Outage |
294 |
346 |
415 |
|
|
|
|
Gen/Flow at 7hrs. |
2633 |
81 |
1747 |
2221 |
14 |
6682 |