Power Supply and Generation Data for 4-April-2008

Home           Past data           Monthly report           Trend           Unit outages 

 

1.        Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW              

3335

2274

2982

8591

07.00

Min. Demand catered in MW   

2786

2309

1014

6109

19.00

Energy Catered in Mus

74.154

52.857

55.721

182.732

Schedule Share

Central Sector + Bilateral

45.470

      2.    BILATERAL TRANSACTION DATA IN MUs:

Bilateral  Sale  

0.000

Bilateral Purchase

0.000

 

3.        FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.36

48.99

49.87

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.668

11.460

17.374

12.637

50.139

UGVCL

3.345

2.581

16.992

7.858

30.776

MGVCL

2.154

5.036

3.074

6.934

17.198

DGVCL

4.095

5.228

2.291

15.453

27.067

TOTAL

18.262

24.305

39.731

42.882

125.180

                                                                                               

5.        Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

72.362 MUS

b

DAILY PLF

        71.46  %

C

DAILY PAF

         82.54  %

D

CUMMULATIVE PLF

75.84  %

E

CUMMULATIVE PAF

81.73 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

          59.17  %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

        76.13%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

          77.49 %

 

6.    Generation available in MW at 07.00 Hours

GUJARAT

PLF Thermal

Hydro

PVT+(CPP+215 )

CEN.SEC(GUJ+DD+DNH)

Bileteral

TOTAL GUJARAT

Tot   Total Capacity

4219

547

2727

* 3001

14

10185

Capacity Available

4219

547

2727

1972

14

9465

Planned Outage

 207

0

78

 

 

 

Force Outage

750

120

50

 

 

 

Available

       272

0

 436

 

 

 

Rest Outage

294

346

415

 

 

 

Gen/Flow at 7hrs.

2633

81

1747

2221

14

6682