Power Supply and Generation Data for 6-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3450 |
1855 |
2645 |
7950 |
23.00 |
|
Min. Demand catered in MW |
2845 |
1763 |
2325 |
6933 |
5.00 |
|
Energy Catered in Mus. |
76.563 |
43.406 |
58.819 |
178.788 |
|
|
Schedule Share |
Central Sector + Bilateral |
40.911 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.48 |
48.81 |
49.93 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.957 |
11.321 |
16.927 |
12.298 |
49.503 |
|
UGVCL |
4.271 |
2.999 |
14.646 |
8.604 |
30.520 |
|
MGVCL |
2.561 |
5.209 |
2.663 |
7.359 |
17.792 |
|
DGVCL |
4.28 |
5.144 |
2.124 |
15.204 |
26.752 |
|
TOTAL |
20.069 |
24.673 |
36.36 |
43.465 |
124.567 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
73.860Mus |
|
B |
DAILY PLF |
72.94% |
|
C |
DAILY PAF |
81.48% |
|
D |
CUMMULATIVE PLF |
73.31% |
|
E |
CUMMULATIVE PAF |
81.72% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
75.55% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
73.54% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.11% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
13 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1722 |
13 |
9215 |
|
Planned Outage |
270 |
0 |
78 |
|
|
|
|
Force Outage |
202 |
120 |
98 |
|
|
|
|
Available |
107 |
0 |
436 |
|
|
|
|
Restricted Outage |
258 |
346 |
227 |
|
|
|
|
Gen. / Flow 7hrs. |
3382 |
81 |
1888 |
2506 |
13 |
7857 |