Power Supply and Generation Data for 9-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3473 |
2460 |
2732 |
8665 |
23.00 |
|
Min. Demand catered in MW |
3188 |
2397 |
2354 |
7939 |
4.00 |
|
Energy Catered in Mus. |
78.657 |
58.640 |
59.689 |
196.986 |
|
|
Schedule Share |
Central Sector + Bilateral |
49.627 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.99 |
48.70 |
49.12 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.175 |
11.586 |
17.453 |
12.963 |
51.177 |
|
UGVCL |
4.590 |
3.386 |
20.485 |
9.116 |
37.577 |
|
MGVCL |
3.073 |
5.93 |
2.988 |
8.262 |
20.253 |
|
DGVCL |
4.667 |
5.588 |
1.899 |
16.519 |
28.673 |
|
TOTAL |
21.505 |
26.490 |
42.825 |
46.860 |
137.680 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
76.452Mus |
|
B |
DAILY PLF |
75.50% |
|
C |
DAILY PAF |
81.57% |
|
D |
CUMMULATIVE PLF |
74.68% |
|
E |
CUMMULATIVE PAF |
81.72% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
|
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.50% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.88% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
14 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2154 |
14 |
9647 |
|
Planned Outage |
270 |
0 |
78 |
|
|
|
|
Force Outage |
229 |
180 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
291 |
286 |
306 |
|
|
|
|
Gen. / Flow 7hrs. |
3510 |
81 |
2293 |
2449 |
14 |
8252 |