Power Supply and Generation Data for 11-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3637 |
2761 |
2229 |
8627 |
15.00 |
|
Min. Demand catered in MW |
3754 |
2531 |
1615 |
7900 |
10.00 |
|
Energy Catered in Mus. |
88.210 |
62.458 |
48.648 |
199.316 |
|
|
Schedule Share |
Central Sector + Bilateral |
48.246 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.300 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.85 |
48.72 |
49.12 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.361 |
12.286 |
18.672 |
12.489 |
52.808 |
|
UGVCL |
4.662 |
3.538 |
23.237 |
8.976 |
40.413 |
|
MGVCL |
3.192 |
5.771 |
3.154 |
7.593 |
19.710 |
|
DGVCL |
4.356 |
5.656 |
1.968 |
16.719 |
28.699 |
|
TOTAL |
21.571 |
27.251 |
47.031 |
45.777 |
141.630 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
85.644Mus |
|
B |
DAILY PLF |
84.58% |
|
C |
DAILY PAF |
88.09% |
|
D |
CUMMULATIVE PLF |
76.19% |
|
E |
CUMMULATIVE PAF |
81.73% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
84.94% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.74% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
77.19% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
12 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2174 |
12 |
9667 |
|
Planned Outage |
270 |
0 |
203 |
|
|
|
|
Force Outage |
120 |
180 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
245 |
287 |
163 |
|
|
|
|
Gen. / Flow 7hrs. |
3584 |
80 |
2459 |
2351 |
12 |
8474 |