Power Supply and Generation Data for 12-April-2008

Home           Past data           Monthly report           Trend           Unit outages 

1.        Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW              

3618

2632

2540

8790

15.00

Min. Demand catered in MW   

3587

2512

   1993

8092

10.00

Energy Catered in MUs

87.368

60.768

51.945

200.081

Schedule Share

Central Sector + Bilateral

47.018

 

2.    BILATERAL TRANSACTION DATA IN MUs:

Bilateral  Sale  

0.450

Bilateral Purchase

0.000

 

3.        FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

49.91

48.71

49.32

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

9.297

12.200

18.526

12.660

52.683

UGVCL

4.783

3.464

23.717

9.512

41.476

MGVCL

3.277

5.901

3.328

7.649

20.155

DGVCL

4.462

5.462

1.957

16.144

28.025

TOTAL

21.819

27.027

47.528

45.965

142.339

                                                                                               

5.        Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

84.550 MUs

B

DAILY PLF

83.50 %

C

DAILY PAF

88.09  %

D

CUMMULATIVE PLF

76.80 %  

E

CUMMULATIVE PAF

81.74 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

 80.61  % 

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

 83.62 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

77.72 %

 

6.    Generation available in MW at 07.00 Hours

GUJARAT

PLF Thermal

Hydro

PVT+(CPP+215 )

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Tot     Total Capacity

4219

547

2727

* 3001

15

10185

Capacity Available

4219

547

2727

2167

15

9660

Planned Outage

270

0

125

 

 

 

Force Outage

330

180

50

 

 

 

Available

0

0

 0

 

 

 

Rest Outage

218

160

273

 

 

 

Gen/Flow at 7hrs.

3401

207

2455

2402

15

8465