Power Supply and Generation Data for 12-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3618 |
2632 |
2540 |
8790 |
15.00 |
|
Min. Demand catered in MW |
3587 |
2512 |
1993 |
8092 |
10.00 |
|
Energy Catered in MUs |
87.368 |
60.768 |
51.945 |
200.081 |
|
|
Schedule Share |
Central Sector + Bilateral |
47.018 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
0.450 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
49.91 |
48.71 |
49.32 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.297 |
12.200 |
18.526 |
12.660 |
52.683 |
|
UGVCL |
4.783 |
3.464 |
23.717 |
9.512 |
41.476 |
|
MGVCL |
3.277 |
5.901 |
3.328 |
7.649 |
20.155 |
|
DGVCL |
4.462 |
5.462 |
1.957 |
16.144 |
28.025 |
|
TOTAL |
21.819 |
27.027 |
47.528 |
45.965 |
142.339 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.550 MUs |
|
B |
DAILY PLF |
83.50 % |
|
C |
DAILY PAF |
88.09 % |
|
D |
CUMMULATIVE PLF |
76.80 % |
|
E |
CUMMULATIVE PAF |
81.74 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
80.61 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.62 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
77.72 % |
6. Generation available in MW at 07.00 Hours
GUJARAT |
PLF Thermal |
Hydro |
PVT+(CPP+215 ) |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Tot Total Capacity |
4219 |
547 |
2727 |
* 3001 |
15 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2167 |
15 |
9660 |
|
Planned Outage |
270 |
0 |
125 |
|
|
|
|
Force Outage |
330 |
180 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Rest Outage |
218 |
160 |
273 |
|
|
|
|
Gen/Flow at 7hrs. |
3401 |
207 |
2455 |
2402 |
15 |
8465 |