Power Supply and Generation Data for 14-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3641 |
2749 |
2251 |
8641 |
15.00 |
|
Min. Demand catered in MW |
3637 |
2402 |
1994 |
8033 |
18.30 |
|
Energy Catered in Mus. |
87.692 |
62.090 |
49.416 |
199.198 |
|
|
Schedule Share |
Central Sector + Bilateral |
43.825 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.700 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.96 |
48.79 |
49.31 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.332 |
10.945 |
18.584 |
11.580 |
50.441 |
|
UGVCL |
4.569 |
3.221 |
24.232 |
8.246 |
40.268 |
|
MGVCL |
3.195 |
5.868 |
3.398 |
7.582 |
20.043 |
|
DGVCL |
4.806 |
5.491 |
2.077 |
16.229 |
28.603 |
|
TOTAL |
21.902 |
25.525 |
48.291 |
43.637 |
139.355 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
85.304Mus |
|
B |
DAILY PLF |
86.60% |
|
C |
DAILY PAF |
88.09% |
|
D |
CUMMULATIVE PLF |
75.85% |
|
E |
CUMMULATIVE PAF |
81.75% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
80.54% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.59% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
78.43% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
-34 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2167 |
-34 |
9660 |
|
Planned Outage |
270 |
75 |
0 |
|
|
|
|
Force Outage |
330 |
180 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
221 |
213 |
217 |
|
|
|
|
Gen. / Flow 7hrs. |
3398 |
79 |
2460 |
2269 |
-34 |
8206 |