Power Supply and Generation Data for 15-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3641 |
2817 |
2251 |
8865 |
15.00 |
|
Min. Demand catered in MW |
3377 |
2594 |
2225 |
8196 |
5.00 |
|
Energy Catered in Mus |
85.593 |
63.398 |
54.098 |
203.089 |
|
|
Schedule Share |
Central Sector + Bilateral |
48.614 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.700 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.88 |
48.69 |
49.15 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
| PGVCL |
9.231 |
12.032 |
18.326 |
12.899 |
52.488 |
| UGVCL |
4.700 |
3.440 |
23.895 |
9.136 |
41.171 |
| MGVCL |
3.208 |
5.993 |
3.434 |
7.832 |
20.467 |
| DGVCL |
4.748 |
5.297 |
2.095 |
15.658 |
27.798 |
| TOTAL |
21.887 |
26.762 |
47.750 |
45.525 |
141.924 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
82.866 MUs |
|
B |
DAILY PLF |
81.84 % |
|
C |
DAILY PAF |
85.52 % |
|
D |
CUMMULATIVE PLF |
77.87 % |
|
E |
CUMMULATIVE PAF |
81.75 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
85.87 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.90 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
78.66 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
-34 |
10185 |
|
CapacityAvailable |
4219 |
547 |
2727 |
2157 |
-34 |
9650 |
|
Planned Outage |
270 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
255 |
98 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Rest Outage |
206 |
212 |
199 |
|
|
|
|
Gen/Flow at 7hrs. |
3623 |
80 |
2430 |
2287 |
-34 |
8420 |