Power Supply and Generation Data for 17-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3626 |
2518 |
2416 |
8560 |
02.00 |
|
Min. Demand catered in MW |
3559 |
2487 |
2036 |
8082 |
17.00 |
|
Energy Catered in Mus. |
87.749 |
58.643 |
54.528 |
200.920 |
|
|
Schedule Share |
Central Sector + Bilateral |
49.713 |
|||
|
|
|
|
|||
2. BILATERAL TRANSCATION DATA IN Mus :
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.77 |
48.60 |
49.01 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.098 |
11.943 |
18.571 |
12.702 |
52.314 |
|
UGVCL |
4.716 |
3.457 |
23.655 |
8.258 |
40.086 |
|
MGVCL |
3.267 |
6.084 |
3.314 |
8.113 |
20.778 |
|
DGVCL |
4.604 |
5.390 |
2.097 |
15.932 |
28.023 |
|
TOTAL |
21.685 |
26.874 |
47.637 |
45.005 |
141.201 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
85.320 MUs |
|
B |
DAILY PLF |
84.26 % |
|
C |
DAILY PAF |
88.09 % |
|
D |
CUMMULATIVE PLF |
78.62 % |
|
E |
CUMMULATIVE PAF |
81.76 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
85.23 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.36 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.33 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2206 |
16 |
9699 |
|
Planned Outage |
270 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
255 |
235 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
233 |
212 |
227 |
|
|
|
|
Gen. / Flow 7hrs. |
3596 |
80 |
2532 |
2164 |
16 |
8372 |