Power Supply and Generation Data for 19-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3491 |
2440 |
2714 |
8645 |
15.00 |
|
Min. Demand catered in MW |
3481 |
2398 |
2141 |
8020 |
24.00 |
|
Energy Catered in MUs |
83.903 |
59.514 |
57.820 |
201.237 |
|
|
Schedule Share |
Central Sector + Bilateral |
49.920 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
49.72 |
48.61 |
49.02 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.104 |
11.969 |
17.678 |
12.517 |
51.268 |
|
UGVCL |
4.713 |
3.368 |
22.574 |
9.153 |
39.808 |
|
MGVCL |
3.263 |
6.096 |
3.312 |
8.147 |
20.818 |
|
DGVCL |
4.760 |
5.370 |
2.076 |
15.875 |
28.081 |
|
TOTAL |
21.840 |
26.803 |
45.640 |
45.692 |
139.975 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
81.456 MUs |
|
B |
DAILY PLF |
80.44 % |
|
C |
DAILY PAF |
82.54 % |
|
D |
CUMMULATIVE PLF |
79.04 % |
|
E |
CUMMULATIVE PAF |
81.77 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
81.84 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.44 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
79.68 % |
6. Generation available in MW at 07.00 Hours
GUJARAT |
PLF Thermal |
Hydro |
PVT+(CPP+215 ) |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Tot Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2030 |
16 |
9523 |
|
Planned Outage |
270 |
0 |
0 |
|
|
|
|
Force Outage |
360 |
235 |
235 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Rest Outage |
136 |
211 |
125 |
|
|
|
|
Gen/Flow at 7hrs. |
3453 |
81 |
2367 |
2173 |
16 |
8074 |