Power Supply and Generation Data for 21-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3639 |
2595 |
2481 |
8715 |
16.00 |
|
Min. Demand catered in MW |
3683 |
2313 |
1998 |
7994 |
9.00 |
|
Energy Catered in Mus. |
87.021 |
58.446 |
52.514 |
197.981 |
|
|
Schedule Share |
Central Sector + Bilateral |
46.921 |
|||
|
|
|
|
|||
2. BILATERAL TRANSCATION DATA IN Mus :
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.88 |
48.62 |
49.09 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.031 |
11.025 |
18.389 |
11.179 |
49.624 |
|
UGVCL |
4.670 |
3.291 |
24.066 |
8.225 |
40.252 |
|
MGVCL |
3.303 |
6.079 |
3.329 |
8.050 |
20.761 |
|
DGVCL |
4.752 |
5.262 |
1.979 |
15.554 |
27.547 |
|
TOTAL |
21.756 |
25.657 |
47.763 |
43.008 |
138.184 |
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
85.193MUs |
|
B |
DAILY PLF |
84.13 % |
|
C |
DAILY PAF |
87.97 % |
|
D |
CUMMULATIVE PLF |
79.38 % |
|
E |
CUMMULATIVE PAF |
81.78 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
82.79 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.23 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.97 % |
6.Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2144 |
16 |
9637 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
330 |
255 |
250 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
196 |
159 |
224 |
|
|
|
|
Gen. / Flow 7hrs. |
3493 |
133 |
2253 |
2277 |
16 |
8156 |
|
|
3653 |
81 |
2412 |
2169 |
16 |
8315 |