Power Supply and Generation Data for 22-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3513 |
2481 |
2544 |
8538 |
19.30 |
|
Min. Demand catered in MW |
3466 |
2443 |
2192 |
8101 |
3.00 |
|
Energy Catered in Mus. |
84.673 |
58.287 |
55.931 |
198.891 |
|
|
Schedule Share |
Central Sector + Bilateral |
48.645 |
|||
2. BILATERAL TRANSCATION DATA IN Mus :
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
48.72 |
48.60 |
49.00 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.224 |
12.240 |
17.381 |
12.525 |
51.370 |
|
UGVCL |
4.805 |
3.469 |
22.426 |
8.751 |
39.451 |
|
MGVCL |
3.350 |
6.096 |
3.413 |
7.960 |
20.819 |
|
DGVCL |
4.719 |
5.360 |
1.950 |
15.843 |
27.872 |
|
TOTAL |
22.098 |
27.165 |
45.170 |
45.079 |
139.512 |
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
82.315MUs |
|
B |
DAILY PLF |
81.29 % |
|
C |
DAILY PAF |
84.77 % |
|
D |
CUMMULATIVE PLF |
79.47 % |
|
E |
CUMMULATIVE PAF |
81.78 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
85.94 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.29 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.03 % |
6.Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2136 |
16 |
9629 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
255 |
250 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Rest Outage |
273 |
212 |
154 |
|
|
|
|
Gen/Flow at 7hrs. |
3626 |
80 |
2323 |
2037 |
16 |
8066 |