Power Supply and Generation Data for 25-April-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3581 |
2433 |
2383 |
8397 |
11.00 |
|
Min. Demand catered in MW |
3258 |
2424 |
2038 |
7720 |
2.00 |
|
Energy Catered in MUs |
81.588 |
59.226 |
52.626 |
193.440 |
|
|
Schedule Share |
Central Sector + Bilateral |
48.315 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
49.44 |
48.58 |
48.86 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.241 |
12.417 |
16.259 |
12.52 |
50.437 |
|
UGVCL |
4.851 |
3.482 |
18.021 |
9.066 |
35.420 |
|
MGVCL |
3.298 |
6.144 |
3.409 |
8.134 |
20.985 |
|
DGVCL |
4.780 |
5.377 |
2.052 |
15.895 |
28.104 |
|
TOTAL |
22.17 |
27.42 |
39.741 |
45.615 |
134.946 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
79.321 MUs |
|
|
B |
DAILY PLF |
78.34 % |
|
|
C |
DAILY PAF |
82.86 % |
|
|
D |
CUMMULATIVE PLF |
79.80 % |
|
|
E |
CUMMULATIVE PAF |
81.79 % |
|
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
75.78 % |
|
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
78.34 % |
|
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
80.30 % |
|
6. Generation available in MW at 07.00 Hours
GUJARAT |
PLF Thermal |
Hydro |
PVT+(CPP+215 ) |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Tot Total Capacity |
4219 |
547 |
2727 |
* 3001 |
15 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2110 |
15 |
9603 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
520 |
120 |
0 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Rest Outage |
302 |
346 |
264 |
|
|
|
|
Gen/Flow at 7hrs. |
3197 |
81 |
2563 |
2348 |
15 |
8189 |