Power Supply and Generation Data for 06 August 2007
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
2099 |
2669 |
1718 |
6486 |
21.00 |
|
Min. Demand catered in MW |
1612 |
2087 |
1499 |
5198 |
4.00 |
|
Energy Catered in MUs. |
54.728 |
43.487 |
44.397 |
142.612 |
|
|
Schedule Share |
Central Sector + Bilateral |
40.811 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
3.225 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.56 |
49.05 |
49.89 |
4. Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.
UGVCL |
12.00 |
Hours |
|
MGVCL |
12.00 |
Hours |
|
DGVCL |
12.00 |
Hours |
|
PGVCL |
12.54 |
Hours |
|
Average |
12.14 |
Hours |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
45.768 Mus |
|
M |
DAILY PLF |
46.44 % |
|
C |
DAILY PAF |
57.28 % |
|
D |
CUMMULATIVE PLF |
71.11 % |
|
E |
CUMMULATIVE PAF |
80.41 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
50.16 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
68.05% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.78 % |
6. Generation available in MW at 07.00 Hours
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Tot Total Capacity |
4174 |
547 |
2725 |
* 3001 |
-32 |
10070 |
|
Capacity Available |
4174 |
547 |
2725 |
1923 |
-32 |
9369 |
|
Planned Outage |
540 |
0 |
125 |
|
|
|
|
Force Outage |
210 |
120 |
15 |
|
|
|
|
Available |
993 |
0 |
601 |
|
|
|
|
Restricted Outage |
251 |
67 |
377 |
|
|
|
|
Gen/Flow at 7hrs. |
2181 |
360 |
1607 |
1357 |
-32 |
5505 |