Power Supply and Generation Data for 13 August 2007
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
1747 |
2880 |
1937 |
6564 |
21.00 |
|
Min. Demand catered in MW |
1595 |
2111 |
1433 |
5139 |
4.00 |
|
Energy Catered in MUs. |
51.824 |
48.130 |
40.059 |
140.013 |
|
|
Schedule Share |
Central Sector + Bilateral |
42.963 |
|||
2. BILATERAL TRANSACTION DATA IN MUs:
|
Bilateral Sale |
3.692 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.30 |
48.73 |
49.57 |
4. Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.
UGVCL |
12.00 |
Hours |
|
MGVCL |
12.00 |
Hours |
|
DGVCL |
12.00 |
Hours |
|
PGVCL |
12.00 |
Hours |
|
Average |
12.00 |
Hours |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
41.589 Mus |
|
M |
DAILY PLF |
42.20 % |
|
C |
DAILY PAF |
54.10 % |
|
D |
CUMMULATIVE PLF |
69.68 % |
|
E |
CUMMULATIVE PAF |
80.19 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
41.56 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
74.69% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.61% |
6. Generation available in MW at 07.00 Hours
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Tot Total Capacity |
4174 |
547 |
2725 |
* 3001 |
-422 |
10070 |
|
Capacity Available |
4174 |
547 |
2725 |
1632 |
-422 |
9078 |
|
Planned Outage |
540 |
0 |
0 |
|
|
|
|
Force Outage |
210 |
120 |
140 |
|
|
|
|
Available |
1413 |
0 |
655 |
|
|
|
|
Restricted Outage |
205 |
13 |
190 |
|
|
|
|
Gen/Flow at 7hrs. |
1807 |
414 |
1740 |
1742 |
-422 |
5703 |