Power Supply and Generation Data for 18 August 2007

Home                    Past data                   Monthly report

      1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

2457

2739

1896

7092

20.30

Min. Demand catered   in  MW

2062

2805

946

5813

4.00

Energy Catered   in Mus.

61.279

53.486

41.501

156.266

Schedule Share

Central Sector + Bilateral

41.001

 

 

 

 

2. BILATERAL TRANSACATION DATA IN Mus:

Bilateral Sale   

5.992

Bilateral Purchase

0.000

 

3. FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.10

48.96

49.46

 

4. Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

12.12

Hours

MGVCL

12.00

Hours

DGVCL

13.23

Hours

PGVCL 

12.00

Hours

Average

12.24

Hours

 

 5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

    52.337 Mus

B

DAILY PLF

    53.10 %

C

DAILY PAF

    62.33 %

D

CUMMULATIVE PLF

    68.88 %

E

CUMMULATIVE PAF

    80.06 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

    58.60 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

    55.54%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

    75.33%

 

 6. Generation available in MW at 07.00 Hours          

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4174

547

2725

 3001

-124

10070

Capacity Available

4174

547

2725

1780

-124

9226

Planned Outage

660

0

296

 

 

 

Force Outage

605

120

140

 

 

 

Available  

   0

0

 436

 

 

 

Restricted Outage

394

 158

129

 

 

 

Gen. / Flow 7hrs.

2516

268

1724

2054

-124

6562