Power Supply and Generation Data for 01-August-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3032 |
2020 |
2070 |
7122 |
20.30 |
|
Min. Demand catered in MW |
2658 |
1840 |
1907 |
6405 |
4.00 |
|
Energy Catered in Mus. |
70.295 |
45.529 |
47.884 |
163.708 |
|
|
Schedule Share |
Central Sector + Bilateral |
52.148 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
7.100 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.25 |
48.81 |
49.48 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.330 |
11.398 |
7.313 |
11.669 |
38.710 |
|
UGVCL |
4.733 |
3.224 |
7.245 |
9.577 |
24.779 |
|
MGVCL |
3.225 |
5.588 |
1.413 |
8.860 |
19.086 |
|
DGVCL |
4.263 |
5.338 |
0.213 |
15.778 |
25.592 |
|
TOTAL |
20.551 |
25.548 |
16.184 |
45.884 |
108.167 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
70.280Mus |
|
B |
DAILY PLF |
69.41% |
|
C |
DAILY PAF |
80.25% |
|
D |
CUMMULATIVE PLF |
75.03% |
|
E |
CUMMULATIVE PAF |
81.62% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
71.65% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
70.59% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.62% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3233 |
363 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2243 |
363 |
9736 |
|
Planned Outage |
420 |
0 |
302 |
|
|
|
|
Force Outage |
240 |
135 |
223 |
|
|
|
|
Available |
197 |
405 |
436 |
|
|
|
|
Restricted Outage |
339 |
6 |
69 |
|
|
|
|
Gen. / Flow 7hrs. |
3023 |
1 |
1696 |
1626 |
363 |
6346 |