Power Supply and Generation Data for 04-August-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
2957 |
1591 |
2308 |
6856 |
22.00 |
|
Min. Demand catered in MW |
2646 |
1254 |
1671 |
5571 |
5.00 |
|
Energy Catered in Mus. |
69.942 |
33.954 |
44.845 |
148.741 |
|
|
Schedule Share |
Central Sector + Bilateral |
49.051 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
1.975 |
|
Bilateral Purchase |
7.030 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.18 |
48.77 |
49.41 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.319 |
10.417 |
3.659 |
10.126 |
32.521 |
|
UGVCL |
4.716 |
3.187 |
2.924 |
8.870 |
19.697 |
|
MGVCL |
3.091 |
5.532 |
0.750 |
9.524 |
18.897 |
|
DGVCL |
4.241 |
5.289 |
0.125 |
15.633 |
25.288 |
|
TOTAL |
20.367 |
24.425 |
7.458 |
44.153 |
96.403 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
69.926Mus |
|
B |
DAILY PLF |
69.06% |
|
C |
DAILY PAF |
79.50% |
|
D |
CUMMULATIVE PLF |
74.88% |
|
E |
CUMMULATIVE PAF |
81.61% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
69.42% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
70.48% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.48% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3233 |
3 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2131 |
3 |
9624 |
|
Planned Outage |
630 |
0 |
487 |
|
|
|
|
Force Outage |
75 |
135 |
104 |
|
|
|
|
Available |
45 |
405 |
548 |
|
|
|
|
Restricted Outage |
540 |
6 |
167 |
|
|
|
|
Gen. / Flow 7hrs. |
2929 |
1 |
1421 |
1973 |
3 |
6324 |