Power Supply and Generation Data for 31-August-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3090 |
1656 |
3478 |
8224 |
08.00 |
|
Min. Demand catered in MW |
3019 |
1809 |
2818 |
7646 |
18.00 |
|
Energy Catered in Mus. |
73.857 |
41.854 |
73.094 |
188.805 |
|
|
Schedule Share |
Central Sector + Bilateral |
62.611 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
1.000 |
|
Bilateral Purchase |
9.790 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.12 |
48.77 |
49.38 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.182 |
11.026 |
24.938 |
11.202 |
56.348 |
|
UGVCL |
4.747 |
3.024 |
12.732 |
8.160 |
28.663 |
|
MGVCL |
3.359 |
5.679 |
1.628 |
8.729 |
19.395 |
|
DGVCL |
4.841 |
5.940 |
0.467 |
17.559 |
28.807 |
|
TOTAL |
22.129 |
25.669 |
39.765 |
45.650 |
133.213 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
72.768Mus |
|
B |
DAILY PLF |
71.86% |
|
C |
DAILY PAF |
77.45% |
|
D |
CUMMULATIVE PLF |
72.64% |
|
E |
CUMMULATIVE PAF |
81.24% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
76.27% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
72.44% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
73.49% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3233 |
0 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2664 |
0 |
10157 |
|
Planned Outage |
540 |
0 |
218 |
|
|
|
|
Force Outage |
120 |
135 |
328 |
|
|
|
|
Available |
0 |
330 |
172 |
|
|
|
|
Restricted Outage |
341 |
1 |
186 |
|
|
|
|
Gen. / Flow 7hrs. |
3218 |
81 |
1823 |
3051 |
0 |
8173 |