Power Supply and Generation Data for 29-Feb-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3526 |
2497 |
2651 |
8674 |
23.00 |
|
Min. Demand catered in MW |
3138 |
2488 |
2155 |
7781 |
4.00 |
|
Energy Catered in Mus. |
79.081 |
61.029 |
55.691 |
195.801 |
|
|
Schedule Share |
Central Sector + Bilateral |
50.017 |
|||
|
|
|
|
|||
|
Bilateral Sale |
2.650 |
|
Bilateral Purchase |
0.000 |
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.04 |
48.79 |
49.30 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.289 |
10.140 |
21.936 |
13.096 |
53.461 |
|
UGVCL |
3.635 |
2.637 |
25.163 |
9.125 |
40.560 |
|
MGVCL |
2.334 |
5.222 |
3.579 |
6.699 |
17.834 |
|
DGVCL |
3.875 |
5.130 |
2.127 |
15.162 |
26.294 |
|
TOTAL |
18.133 |
23.129 |
52.805 |
44.082 |
138.149 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
76.771 Mus |
|
B |
DAILY PLF |
75.82 % |
|
C |
DAILY PAF |
79.88 % |
|
D |
CUMMULATIVE PLF |
74.93 % |
|
E |
CUMMULATIVE PAF |
81.60 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
75.75 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.85 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.03 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4214 |
547 |
2725 |
* 3001 |
15 |
10185 |
|
Capacity Available |
4214 |
547 |
2725 |
2141 |
15 |
9587 |
|
Planned Outage |
330 |
0 |
60 |
|
|
|
|
Force Outage |
405 |
60 |
0 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
185 |
482 |
285 |
|
|
|
|
Gen. / Flow 7hrs. |
3294 |
5 |
2380 |
2187 |
15 |
7866 |
.