Power Supply and Generation Data for 02-Feb-2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3299 |
2576 |
2615 |
8490 |
20.00 |
|
Min. Demand catered in MW |
3181 |
2117 |
2162 |
7460 |
04.00 |
|
Energy Catered in Mus. |
78.519 |
59.130 |
52.384 |
190.033 |
|
|
Schedule Share |
Central Sector + Bilateral (SCH) |
55.376 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
2.316 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.18 |
48.84 |
49.41 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
7.338 |
9.739 |
22.298 |
10.996 |
50.371 |
|
UGVCL |
3.653 |
2.501 |
27.210 |
8.332 |
41.696 |
|
MGVCL |
2.950 |
5.867 |
3.025 |
8.193 |
20.035 |
|
DGVCL |
4.088 |
5.522 |
2.064 |
16.325 |
27.999 |
|
TOTAL |
18.029 |
23.629 |
54.597 |
43.846 |
140.101 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
78.414 mus |
|
B |
DAILY PLF |
77.44% |
|
C |
DAILY PAF |
82.33% |
|
D |
CUMMULATIVE PLF |
74.22% |
|
E |
CUMMULATIVE PAF |
81.17% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
83.48% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
77.93% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.11% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-306 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2174 |
-306 |
9667 |
|
Planned Outage |
240 |
0 |
0 |
|
|
|
|
Force Outage |
234 |
60 |
160 |
|
|
|
|
Available |
0 |
480 |
0 |
|
|
|
|
Restricted Outage |
223 |
1 |
-47 |
|
|
|
|
Gen. / Flow 7hrs. |
3522 |
5 |
2614 |
1762 |
-207 |
8041 |