Power Supply and Generation Data for 02-Feb-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

        

1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3299

2576

2615

8490

20.00

Min. Demand catered   in  MW

3181

2117

2162

7460

04.00

Energy Catered   in Mus.

78.519

59.130

52.384

190.033

Schedule Share

Central Sector + Bilateral (SCH)

55.376

 

2. BILATERAL TRANSACATION DATA IN Mus:

Bilateral Sale   

2.316

Bilateral Purchase

0.000


 

3. FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.18

48.84

49.41

 

4. DISCOM WISE ENERGY IN Mus.

    DISCOM

        JGY

     URB/TWN

      AGR

        IND

      TOTAL

PGVCL

7.338

9.739

22.298

10.996

50.371

UGVCL

3.653

2.501

27.210

8.332

41.696

MGVCL

2.950

5.867

3.025

8.193

20.035

DGVCL 

4.088

5.522

2.064

16.325

27.999

TOTAL 

18.029

23.629

54.597

43.846

140.101

 

5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

    78.414 mus

B

DAILY PLF

    77.44%

C

DAILY PAF

    82.33%

D

CUMMULATIVE PLF

    74.22%

E

CUMMULATIVE PAF

    81.17%

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

    83.48%

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

    77.93%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

    75.11%

 

 6. Generation available in MW at 07.00 Hours                

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4219

547

2727

3233

-306

10417

Capacity Available

4219

547

2727

2174

-306

9667

Planned Outage

240

0

0

 

 

 

Force Outage

234

60

160

 

 

 

Available  

0

480

  0

 

 

 

Restricted Outage

223

1

-47

 

 

 

Gen. / Flow 7hrs.

3522

5

2614

1762

-207

8041